    Searching for the Michigan stair, deck or smoke alarm rules for a house? The code that applies to one- and two-family homes right now is the 2015 Michigan Residential Code, which is the 2015 International Residential Code (IRC) with Michigan’s changes. This page covers the Michigan changes for stairs, deck ledgers and smoke alarms, quoted from the rules in force. Look up all other details in the code book.

    Which residential code applies

    • Michigan adopts the 2015 edition of the IRC by reference, minus a list of excluded sections, as the Michigan Residential Code (R 408.30500). LARA’s code books page lists the 2015 Michigan Residential Code as the current code, effective February 8, 2016 (LARA code books).
    • The 2021 IRC update is on hold. LARA says a July 7, 2025 Michigan Court of Claims order blocks it from carrying out the 2021 residential rule set while the case continues, and the 2015 versions “will remain valid and in effect” while that order is in place (LARA Currently Open Rules; 2022-16 LR tracker).

    Everything below is from the Part 5 rules in force as of Nov 19, 2026 (R 408.30500–408.30547g).

    Stairs: riser height and tread depth

    Michigan rewrites the IRC riser and tread rules (R 408.30519, printed as R311.7.5.1 and R311.7.5.2):

    • Riser height: “The maximum riser height shall be 8 1/4 inches.” The tallest riser in a flight can’t exceed the smallest by more than 3/8 inch.
    • Tread depth: “The minimum tread depth shall be 9 inches.” The deepest tread in a flight can’t exceed the shallowest by more than 3/8 inch.
    • Winder treads: at least 10 inches deep measured 12 inches from the narrow side, and at least 6 inches deep at any point. Within a flight, winder depths at the 12-inch walk line can’t differ by more than 3/8 inch.

    Michigan’s Part 5 rules don’t change the IRC’s stair width, headroom, handrail or guard sections. Those come straight from the 2015 IRC text, so check the code book for them.

    Exit and interior doors

    Under the same egress rule, the required exit door must be a side-hinged door at least 3 feet wide and 6 feet 8 inches high. Other exterior hinged or sliding doors must be at least 24 inches wide and 6 feet 6 inches high. Interior doors must also be at least 24 inches wide and 6 feet 6 inches high, except doors to areas under 10 square feet (R 408.30518).

    Decks

    • Ledger fasteners: Michigan replaces IRC figure R507.2.1(1), which shows where lag screws and bolts go in deck ledgers and band joists (R 408.30523). Use the Michigan figure, not the one in a plain IRC book.
    • Ledger flashing: Michigan adds R507.2.4: “An approved corrosion resistant flashing as required by Section R703.8 shall be installed above the attached ledger as shown in figure R507.2.1(2) or as approved.” Figure R507.2.1(2) is also Michigan’s own version (R 408.30523a).
    • Some IRC deck items are excluded: Michigan’s adoption rule leaves out several IRC deck provisions, including table R507.2.3 and IRC figure R507.2.1(2), and puts the Michigan versions above in their place (R 408.30500).
    • Permits: a deck needs no building permit only if it meets every one of these conditions: 200 square feet or less, no more than 30 inches above grade at any point, not attached to the house or an accessory structure, not within 36 inches of either, and not serving any entry or exit door (R 408.30505, R105.2). An attached deck needs a permit.

    Smoke alarms

    Michigan rewrites several IRC smoke alarm sections (R 408.30546):

    • Locations (R314.3): in each sleeping room or in the immediate vicinity of the sleeping room, and on each additional story, including basements and habitable attics but not crawl spaces or uninhabitable attics. In a split level with no door between the levels, one alarm on the upper level covers the lower level if the lower level is less than one full story below.
    • Interconnection (R314.4): when more than one alarm is required in a dwelling unit, they must be interconnected so one sets off all. Listed wireless alarms that all sound together meet this. Alarms in existing areas don’t have to be interconnected.
    • Remodels and additions (R314.2.2): when permitted alterations, repairs or additions happen, or a sleeping room is added or created, the dwelling unit needs smoke alarms placed as required for new homes. The exceptions are exterior work (roofing, siding, windows, doors, adding a porch or deck) and electrical, plumbing or mechanical work.
    • Homes built before November 6, 1974 that aren’t getting permitted work need alarms in each sleeping room and on each floor level, including the basement. Battery-operated alarms are one of the allowed power sources for these homes (R314.3.2 and R314.3.3).
    • Upkeep: the owner is responsible for proper operation, testing and maintenance. In rentals, the occupant handles periodic testing and cleaning. A failed system must be repaired and working within 30 days (R314.3.3).

    Carbon monoxide alarms

    When work that requires a building permit happens in an existing house that has an attached garage or fuel-fired appliances, CO alarms must be added per R315.1 (R 408.30520).

    What to do

    • Build stairs to Michigan’s 8 1/4-inch maximum riser and 9-inch minimum tread. Check everything else on stairs against the 2015 IRC text.
    • Use Michigan’s ledger fastener figure and flash every attached ledger. Pull a permit for any attached deck.
    • On any permitted remodel or addition, apart from the exempt exterior and trade work, plan to bring smoke alarms up to new-home placement, plus CO alarms where the house has an attached garage or fuel-fired appliances.
    • Watch the LARA Currently Open Rules page for changes to the court stay.

    Sources: R 408.30500–408.30547g · LARA code books · LARA Currently Open Rules · 2022-16 LR tracker

    More for builders: Michigan Builders updates.

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan building permit exemptions: what does not need a permit

    Before you dig, frame or finish, Michigan law says you need a building permit — unless a statute or the code carves out an exemption. Guessing wrong means stop-work orders and rework. Here is what the primary sources actually exempt, and what they do not.

    Why it matters

    • Except as otherwise provided in Act 230 or the code, construction or alteration of a building or structure shall not be commenced until a building permit has been issued (MCL 125.1511(1)).
    • The enforcing agency has 10 business days to act on an application (15 for an unusually complicated building). Silence is treated as a denial for appeal purposes (MCL 125.1511(1)).
    • Exemptions from a permit are not a free pass to ignore the code. Michigan’s amended section 105.2 says exemptions “shall not be deemed to grant authorization for work to be done in any manner in violation of the provisions of the code or other laws or ordinances” (R 408.30409; same rule for houses in R 408.30505).

    Permit exemptions in Act 230 (statute)

    MCL 125.1510 is the building-permit application section. It also states these permit rules:

    • Ordinary repairs: “A building permit is not required for ordinary repairs of a building or structure” (MCL 125.1510(7)). The statute does not define “ordinary repairs” further.
    • Agricultural incidental buildings: No building permit for a building incidental to agricultural use of the land if it is not used in the business of retail trade (MCL 125.1510(8)).
    • Qualifying roadside stand: Exempt from the act’s plumbing-fixture requirements and need not have electric power; if it has power, the electrical code still applies. It is not exempt from needing a building permit (MCL 125.1510(9)). “Qualifying” means seasonal retail of agricultural products, at least 50% from a farm the stand owner controls, not larger than 400 square feet, and securely anchored.
    • Certain tents: A tent that meets the roadside-stand product and size tests in (9)(a)–(c) is exempt from Act 230 and the code (MCL 125.1510(10)).

    Everything else still starts with the written application in MCL 125.1510(1) unless the code lists another exemption.

    Code list: Michigan Building Code (2021 IBC as amended)

    Part 4 of the Construction Code adopts the 2021 International Building Code with Michigan amendments (R 408.30401, effective April 9, 2025). R 408.30409 rewrites section 105.2. Building permits are not required for, among other listed items:

    • One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, if the floor area does not exceed 120 square feet
    • A fence not more than 7 feet high
    • A retaining wall not more than 4 feet high (bottom of footing to top of wall), unless it supports a surcharge or impounds Class I, II or III-A liquids
    • A water tank on grade, capacity not greater than 5,000 gallons, height-to-diameter (or width) ratio not greater than 2 to 1
    • A sidewalk or driveway not more than 30 inches above adjacent grade, not over a basement or story below, and not part of an accessible route
    • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
    • Prefabricated swimming pools accessory to Group R-3 (as applicable in section 101.2) that are less than 24 inches deep, not greater than 5,000 gallons, and installed entirely above ground
    • Shade cloth structures for nursery or agricultural purposes (not including service systems)
    • Swings and other playground equipment accessory to detached 1- and 2-family dwellings
    • Window awnings in Group R-3 and U that project not more than 54 inches and need no additional support
    • Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches high

    The same rule lists separate electrical, mechanical and plumbing items that do not need those trade permits (for example, stopping leaks in drains without replacing concealed piping). Read the full text in R 408.30409 before you skip a trade permit.

    Houses: Michigan Residential Code list (different sizes)

    Detached 1- and 2-family dwellings and their townhouses follow the Michigan Residential Code. R 408.30505 amends section R105.2. Building permits are not required for a shorter list that includes:

    • One-story detached accessory structures if the floor area does not exceed 200 square feet (larger than the Building Code’s 120-square-foot limit)
    • Fence ≤ 7 feet; retaining wall ≤ 4 feet (unless supporting a surcharge); grade-supported water tank ≤ 5,000 gallons with height-to-width ≤ 2:1; sidewalk/driveway rules similar to the Building Code; finish work; small above-ground pools; swings/playground equipment; limited window awnings
    • Decks, porches, patios, landings or similar structures not exceeding 200 square feet, not more than 30 inches above grade at any point as prescribed by Section R312.1.1, not attached to a dwelling or its accessory structures, not within 36 inches of a dwelling or its accessory structures, and not serving any ingress or egress door

    If your deck is attached, taller, larger or serves a door, that residential exemption does not apply. Ask the local enforcing agency.

    Do not confuse license exemptions with permit exemptions

    MCL 339.2403 lets certain people act as a residential builder or maintenance-and-alteration contractor without that occupational license — for example, an owner building for their own use and occupancy, rental-property maintenance by the owner, a project with an aggregate contract under $600 (with anti-evasion language), or a licensed electrical, plumbing or mechanical contractor doing only their trade work. Those are licensing exemptions under the Occupational Code. They do not, by themselves, waive the building permit under Act 230 or the code lists above. You can be license-exempt and still need a permit, or permit-exempt and still need a license for other work.

    What to do

    • Match the building type: Residential Code list for houses and their accessory structures; Building Code list for other buildings.
    • If the work is not clearly on the statute or Admin Code list, apply before you start (MCL 125.1511).
    • Call or email the local building department when “ordinary repairs” or a borderline deck/shed is in doubt — the enforcing agency reads the same primary text.

    Sources: MCL 125.1510 · MCL 125.1511 · MCL 339.2403 · R 408.30401–30499a · R 408.30500–30547g

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 5, 2026. Confirm with LARA or your local building department before you act.

  • Michigan Rehabilitation Code: draft moves existing buildings to the 2024 IEBC

    Michigan’s rehab code for existing buildings just moved a step forward. On Oct 19, 2026, the state posted draft rule language that would adopt the 2024 International Existing Building Code (IEBC) as the Michigan Rehabilitation Code for Existing Buildings. Filing and effective dates are still Pending.

    What’s in force today

    • The current Michigan Rehabilitation Code adopts the 2021 IEBC by reference, with Michigan amendments in R 408.30551 to R 408.30577.
    • LARA’s code books page lists the current Michigan Rehabilitation Code as effective April 9, 2025.
    • The code covers repair, alteration, change of occupancy, addition and relocation of existing buildings. New, never-occupied buildings go under the Michigan Building Code instead (current R 408.30554).

    Where the update stands

    • Rule set: 2025-40 LR, Rehabilitation Code (R 408.30551–R 408.30577).
    • State rule tracker: Request for Rulemaking approved Oct 6, 2025. Draft Rule Language Approved Oct 19, 2026.
    • As of Oct 19, 2026, Filing date and Effective date both say Pending. No notice of public hearing is posted yet on the tracker.
    • The draft says the rules become effective 120 days after filing with the Secretary of State (same formula the codes use).
    • LARA held a public rules advisory meeting on the proposed Rehabilitation Code draft on May 21, 2026 (LARA currently open rules). That meeting is past; the Oct 19 draft is the next tracker document.

    What the draft would change

    From the draft rule language and the request for rulemaking (verified Oct 19, 2026):

    • Model code: R 408.30551 would adopt the 2024 IEBC (first printing, August 2023) instead of the 2021 edition, with Michigan exceptions.
    • Rescissions: R 408.30552 (references to international codes), R 408.30553 (title), R 408.30558 (preliminary meeting / right of entry) and R 408.30577 (applicability add-ons) would be rescinded. Some of that content moves into R 408.30551 and R 408.30554.
    • Scope: The draft keeps the scope (repair, alteration, change of occupancy, addition, relocation) but strikes Michigan’s sentence sending never-occupied buildings to the Michigan Building Code for new construction (draft R 408.30554).
    • Accessibility: The draft rewrites the primary-function accessible-route language in R 408.30561 so the cost cap ties to MCL 125.1513g (costs of the accessible route need not exceed 20% of the alteration costs that affect the primary-function area).
    • Not the new code yet: Until LARA files and the 120-day clock runs, the 2021-based Michigan Rehabilitation Code still governs.

    Who it affects

    Builders and M&A contractors doing alterations, additions, change-of-occupancy work or other rehab on existing buildings under the Michigan Rehabilitation Code. Permit-exempt work listed in R 408.30560 (for example, a one-story accessory shed 120 sq ft or less, or painting and similar finish work) stays in the draft with the same structure; confirm the final text when it’s filed.

    What to do

    • Now: Keep designing and permitting under the current 2021-based rehab code.
    • Get on LARA’s list: email LARA-BCC-Rules@michigan.gov with the rule set you want in the subject line (LARA’s open-rules page explains the format).
    • Watch the tracker for a hearing notice, then for Filing and Effective dates. When it’s filed, you have about four months before it takes effect.
    • Separately, the 2021-based residential code update for one- and two-family homes is still held up by the July 7, 2025 court stay posted on LARA’s open-rules page. See our residential-code status post below.

    Sources: ARS tracker 2025-40 LR · current R 408.30551–30577 · LARA code books · LARA currently open rules · MCL 125.1513g

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan building permits, inspections and occupancy: the basics

    Michigan’s Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230) sets the ground rules for permits and inspections. The law calls the office that issues permits and inspects the work the “enforcing agency.”

    The permit

    • Before construction, the owner or the owner’s builder, architect, engineer or agent applies in writing to the enforcing agency, with the fee, plans drawn to scale and a site plan (MCL 125.1510(1)).
    • If you apply as the owner’s builder, you file a written contract or letter of authorization from the owner. A residential builder or M&A contractor must list their license number and its expiration date (MCL 125.1510(2)).
    • The agency must grant or deny the application within 10 business days, or 15 for an unusually complicated building. If it doesn’t act in time, that counts as a denial you can appeal (MCL 125.1511(1)).
    • Except as the act or code allows, don’t start work until the permit is issued, and build to the approved plans (MCL 125.1511(1)).

    Inspections

    • The enforcing agency inspects permitted work periodically (MCL 125.1512(1)).
    • Inspections happen between 8 a.m. and 6 p.m. on business days or while work is going on, except in an emergency or with permission (MCL 125.1512(2)).
    • If work doesn’t match the permit or the code, the agency sends written notice. If you don’t show good cause within 1 full working day, it posts a stop-construction order (MCL 125.1512(3)).

    Certificate of occupancy

    • A new building can’t be used or occupied until a certificate of use and occupancy is issued (MCL 125.1513).
    • For alterations, an existing use that didn’t stop during the work can continue for 30 days after completion without a new certificate (MCL 125.1513).
    • Once the work qualifies, the agency issues the certificate within 5 business days of a written application and fee. A temporary certificate is possible for parts that are safe to occupy (MCL 125.1513).
    • The agency gives at least 12 hours’ notice of the final inspection (MCL 125.1513).

    What to do

    • Carry your license number and expiration date to every permit application.
    • Don’t schedule move-in until the certificate of occupancy is issued.
    • Fees and local procedures vary, so check with your local building department.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Michigan energy code for houses: where it stands

    For houses, Michigan’s energy rules live in the residential code. A 2021 update is on hold, so the 2015-based rules still apply.

    Houses

    • LARA says residential energy requirements are contained in the Michigan Residential Code (LARA code books). The current residential code is the 2015 edition, effective Feb 8, 2016 (LARA).
    • Rule set 2021-48 LR (Part 10, Michigan Uniform Energy Code, R 408.31001 to R 408.31086) was filed May 1, 2025 with an effective date of Aug 29, 2025 on the state tracker (state tracker).
    • The July 7, 2025 Court of Claims stipulated order stops LARA from implementing the two rule sets that would update the residential code and its residential energy chapter to the 2021 IRC and 2021 IECC. While it stands, the 2015 residential IECC provisions “will remain valid and in effect” (LARA currently open rules).
    • As of Oct 17, 2026, LARA’s open rules page still shows that order in place.

    Commercial and multifamily work

    • The 2021 Michigan Commercial Energy Code took effect April 22, 2025 (LARA code books).
    • Proposed: an update, rule set 2025-41 LR (Part 10a), is in progress. LARA held an advisory meeting on the draft May 21, 2026, and the tracker shows draft rule language approved Oct 13, 2026 (LARA, state tracker). As of Oct 17, 2026, filing and effective dates are “Pending” (tracker).

    What to do

    • Keep building houses to the energy chapter of the 2015 Michigan Residential Code.
    • If a customer or supplier quotes 2021 IECC numbers for a house, they’re quoting rules that aren’t in effect in Michigan right now.
    • We’ll alert members if the court order changes.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Builder and M&A license renewal and continuing competency in Michigan

    Michigan residential builder and M&A licenses renew every 3 years. Here’s what LARA requires, with the law behind it.

    Renewal basics

    • Licenses renew every 3 years by May 31. LARA says “not all residential builder licenses renew the same year,” and gives the same note for company, individual and salesperson licenses (LARA renewals page). Check the expiration date printed on your license or in Accela. A license lapses the day after that date (MCL 339.411(1)).
    • You can renew starting 90 days before your expiration date (LARA).
    • Renewal is $150. Renewing after expiration adds a $20 late fee, rising to $35 after 60 days (LARA).
    • Individual licensees can use Express Pay. Company and branch licenses must renew by logging in to Accela (LARA).
    • A company needs both its company license and its qualifying officer’s individual license renewed. If the individual license lapses, the company license is suspended under section 2405 (LARA, MCL 339.2405).
    • When you renew, you state that you have a current copy of the Michigan Residential Code and meet the continuing competency requirements (MCL 339.2404(6)).

    How many hours

    LARA’s summary: 21 hours in your first or second renewal cycle, 3 hours in your third cycle or later (LARA renewals page). The statute has more detail (MCL 339.2404b(2)):

    • First licensed on or after Jan 1, 2009: at least 21 hours per 3-year cycle, including at least 3 hours each calendar year during the first 6 years, and at least 3 hours on state building codes and laws, safety, and changes in construction and business law.
    • Licensed before Jan 1, 2009, or licensed more than two 3-year cycles (with no discipline): at least 3 hours per cycle, made up of 1 hour of codes, 1 hour of safety and 1 hour of legal issues.
    • If LARA has disciplined you, it can order 3 to 21 extra hours in the next cycle (MCL 339.2404b(3)).
    • Company licenses and salespersons don’t need continuing education for those licenses (LARA).

    What counts

    • Construction code update courses approved by the Bureau of Construction Codes, and fire or workplace safety courses approved or sponsored by LARA (MCL 339.2404b(4)).
    • Courses approved by another state’s builder board or by a national, regional or local home builder association, plus college courses, teaching, code hearings and other listed activities (Mich. Admin. Code R 338.1564(1)).
    • Credit is based on 50 minutes of continuous instruction per hour, with half credit for each extra 25 minutes. Breaks and meals don’t count (R 338.1564(4)).
    • Online courses can count (R 338.1566(3)).
    • LARA publishes the 2026/2029 approved course list.

    Proof and waivers

    • Keep your certificates for at least 5 years (MCL 339.2404(7)). You only send proof if you’re audited (LARA).
    • A waiver request must reach LARA before your license cycle expires (R 338.1565).

    What to do

    • Look up your expiration date in Accela and put it, and the date 90 days before it, on the calendar.
    • Count your hours now. If you’re in your first 6 years, make sure you have 3 hours in every calendar year.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Which Michigan Residential Code is in effect? Status of the 2021 update

    Short answer: the 2015 Michigan Residential Code. A 2021-based update was finished but is on hold by court order.

    What’s in effect now

    • The 2015 Michigan Residential Code took effect Feb 8, 2016, and LARA still lists it as the current code (LARA code books).
    • The Michigan Residential Code covers one- and two-family homes. LARA notes that residential requirements for building, mechanical, plumbing, energy and electrical work are in the Michigan Residential Code (LARA code books). The current rules are R 408.30500 to R 408.30547g (Michigan Administrative Code).

    The 2021 update and the court stay

    • Rule set 2022-16 LR would adopt, in part, the 2021 IRC. The state tracker shows it filed May 1, 2025 with an effective date of Aug 29, 2025 (state tracker).
    • On July 7, 2025, the Michigan Court of Claims issued a stipulated order in Home Builders Assoc. et al. v. LARA et al. It stops LARA from “taking additional steps necessary to apply or implement” this rule set and the matching residential energy rule set while the case continues (LARA currently open rules).
    • While the order stands, LARA says the 2015 versions “will remain valid and in effect” (LARA).
    • As of Oct 17, 2026, LARA’s open rules page still shows the stay. The court order itself is posted with the “Final Rule Language” on the tracker.

    Bigger buildings: the Michigan Building Code

    • The 2021 Michigan Building Code took effect April 9, 2025 (LARA code books). It covers buildings that aren’t under the residential code.
    • Proposed: rule set 2025-48 LR would adopt the 2024 IBC with Michigan amendments (request for rulemaking). LARA held a public advisory meeting on the draft on May 21, 2026 (LARA, draft rules). As of Oct 17, 2026, the state tracker shows the filing and effective dates as “Pending” (state tracker). It isn’t the rule yet.
    • The 2021 Michigan Rehabilitation Code took effect April 9, 2025 (LARA). An update, 2025-40 LR, is pending with no filing or effective date as of Oct 17, 2026 (state tracker).

    What to do

    • Build and bid houses to the 2015 Michigan Residential Code, not the 2021 IRC.
    • Remember: at renewal you state that you have a current copy of the Michigan Residential Code (MCL 339.2404(6)).
    • To get rule notices, email LARA-BCC-Rules@michigan.gov with the rule set name in the subject line (LARA).

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Michigan residential builder and M&A licenses: the basics

    Michigan licenses two kinds of residential contractors under Article 24 of the Occupational Code: residential builders and residential maintenance and alteration (M&A) contractors. LARA’s Bureau of Construction Codes runs the licensing (LARA residential builders page).

    Who needs which license

    • Residential builder: someone who, for pay other than wages, builds, replaces, repairs, alters, adds to, improves or demolishes a residential structure (MCL 339.2401(a)).
    • M&A contractor: someone who, for pay, repairs, alters, adds to, improves or demolishes a residential structure, builds a garage, or lays concrete on residential property (MCL 339.2401(b)). An M&A license names the specific craft or trade, such as carpentry, concrete, roofing, siding and gutters, insulation, masonry, excavation or basement waterproofing (MCL 339.2404(3)).
    • “Residential structure” means a detached 1- or 2-family dwelling, or a townhouse of not more than 3 stories with a separate means of egress, plus related facilities (MCL 339.2401(c)).

    Main exemptions

    You don’t need this license if, among other exemptions listed in MCL 339.2403:

    • You’re the owner working on a structure on your property for your own use and occupancy.
    • You only work under contract to a licensed builder or M&A contractor.
    • The whole project is under $600 for labor, materials and everything else. Splitting a job into small contracts to dodge the license doesn’t count.
    • You’re a licensed electrical, plumbing or mechanical contractor doing only that trade’s work.

    Getting licensed

    • Prelicensure: 60 hours of approved courses, with at least 6 hours each in business management, design and building science, contracts and risk, marketing and sales, project management, the current Michigan Residential Code, and MIOSHA construction safety (MCL 339.2404b(1)(c)). LARA publishes the approved course list.
    • Exam: you must pass an exam on your obligations to the public and the licensing laws (MCL 339.2404(2)).
    • Place of business: you must keep a place of business in Michigan (MCL 339.2404(4)).
    • Companies: a company license needs a qualifying officer who also holds an individual license. If the qualifying officer leaves, the company license is suspended unless LARA allows time to name a new one (MCL 339.2405).
    • Licenses run 3 years (MCL 339.2404(5)).

    Why it matters

    • An unlicensed contractor can’t sue to collect payment for work that needed a license, and can’t put a lien on the property (MCL 339.2412(1) and (3)).
    • Prosecutors and the Attorney General can seek a civil fine of $5,000 to $25,000 against unlicensed contractors (MCL 339.2412(4)).
    • Homeowner complaints generally must be filed within 18 months of completion, occupancy, purchase, the certificate of occupancy, or closing, depending on the job (MCL 339.2411(1)).

    What to do

    • Check your own license and your subs’ licenses on LARA’s lookup before you sign.
    • If you run a company, make sure your qualifying officer’s individual license is current too.

    Next: renewals and continuing competency.