Author: Tom Smith

  • Michigan Skilled Trades Regulation Act explained for electricians

    The Skilled Trades Regulation Act is the state law behind every Michigan electrical license. It covers who has to be licensed, who can pull a permit, what the experience requirements are, and what happens if you work without a license. It’s a separate thing from the electrical code (the NEC as amended by Michigan) and from the skilled trades rules LARA is rewriting. This page explains how the act is put together and what it says to electricians, quoting the statute.

    What the act is

    • It’s 2016 PA 407, MCL 339.5101 to 339.6133, and it’s cited as the “skilled trades regulation act.” It took effect April 4, 2017 (MCL 339.5101; Act 407 index).
    • It replaced the separate trade acts, including former 1956 PA 217 for electricians. Licenses issued under a former act carried over until they expire, and rules made under the former acts stay in effect where they don’t conflict with the new act (MCL 339.5109).
    • It has 11 articles. Articles 1–6 apply to every trade: definitions, issuing licenses, boards, fees, complaints and investigations, and penalties. Articles 7–11 cover the trades: Article 7 electricians and electrical contractors, Article 8 mechanical contractors, Article 9 boilers, Article 10 building officials and inspectors, and Article 11 plumbers (Act 407 index).

    Act, code and rules: three different things

    • The act (PA 407) covers licensing and enforcement.
    • The licensing rules, R 339.5101–5412, are LARA’s Skilled Trades Regulation Rules, issued under sections 207, 209 and 907 of the act (R 339.5101–5412). A rewrite, 2025-58 LR, still shows Filing date: Pending as of Nov 19, 2026 (2025-58 LR tracker).
    • The electrical code, Part 8, is issued under a different law, the Stille-DeRossett-Hale single state construction code act, 1972 PA 230 (R 408.30801–30880). LARA lists the 2023 NEC as the current code, effective March 12, 2024 (LARA code books).

    Article 7: who must be licensed

    • “Only an individual who is licensed under this article shall install electrical wiring.” Where inspection service is provided, a permit is required from the board or the municipality with jurisdiction (MCL 339.5731(1)).
    • No one may engage in the business of electrical contracting without an electrical contractor’s license from the board or the appropriate municipality. An individual may not execute electrical wiring unless they’re licensed under Article 7 and employed by, and working under the direction of, a licensed electrical contractor (MCL 339.5737(1)–(2)).
    • Fire alarm work and electric sign work each require a license too (MCL 339.5731(3)–(4)).

    Work the act exempts

    MCL 339.5737(3) lists classes of work that don’t need a license. A few that come up on jobs:

    • minor repair work
    • a homeowner’s own electrical work in the single-family home and outbuildings they own and live in, or will live in
    • work by licensed mechanical contractors in certain classifications and licensed plumbing contractors, and their employees, on control wiring and electrical parts of existing mechanical and plumbing systems on the load side of the unit disconnect, except life safety wiring
    • listed lawn irrigation and landscape lighting equipment, except permanent wired connections over 30 volts
    • security alarm systems
    • telecommunications work by companies primarily in that industry (fire alarm systems are not included in this exemption)

    License levels in the act

    • Journeyman: at least 20 years old, with at least 8,000 hours of experience over at least 4 years under the direct supervision of a licensee (MCL 339.5715(1)).
    • Master: at least 22 years old, with at least 12,000 hours over 6 years or more under a master electrician’s supervision and a journeyman license held for at least 2 years (MCL 339.5713(1)).
    • Contractor: issued to a master electrician, or to a business with at least 1 full-time master electrician who lives in Michigan and is in charge of code compliance. A master can qualify only 1 contractor license (MCL 339.5711; MCL 339.5713(3)).
    • Exam retakes: fail the journeyman or master exam twice within 2 years and you wait at least 1 year. To sit again, you show you’ve completed a board-approved course on the Michigan electrical code, electrical fundamentals or electrical theory (MCL 339.5713(2); MCL 339.5715(3)).
    • Code update course: to renew, masters and journeymen must complete a board-approved course on any state construction code update within 12 months after the change (MCL 339.5713(4); MCL 339.5715(4)).

    City licenses and registration

    A municipality with its own licensing and inspection ordinance that meets the act’s standards can run its own program, and Article 7 doesn’t apply in its jurisdiction. State licenses, and municipal licenses issued under standards at least as strict, “shall be recognized by all municipalities.” Cities that provide electrical inspection can require contractors to register, but licensed journeymen don’t have to register to work in places under the board’s jurisdiction (MCL 339.5733; MCL 339.5735).

    Penalties for unlicensed work

    Practicing a regulated trade without a license, including on a suspended, revoked or lapsed license, is a misdemeanor: up to $500 and/or 90 days the first time, and up to $1,000 and/or 1 year the second time. A third or later offense is a felony, with up to $25,000 and/or 5 years. Courts can order restitution, and affected people, including licensees, can sue for an injunction (MCL 339.5601).

    What to do

    • Know which article covers you (Article 7), and keep the act, the Part 8 code rules and the R 339 licensing rules separate in your head.
    • Before you hire or sub out, confirm the license level matches the work. Use the act’s exemption list before you assume a job doesn’t need a license.
    • Watch the 2025-58 LR tracker. The act stays the same, but the rules under it are changing.

    Sources: 2016 PA 407 (MCL 339.5101–339.6133) · MCL 339.5737 · MCL 339.5601 · R 339.5101–5412 · 2025-58 LR tracker · LARA code books

    More for Electrical contractors: Michigan Electrical updates.

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan plumbing code book: which edition to buy and where to read it

    Which Michigan plumbing code book should you have on the truck? As of Nov 19, 2026, it’s the 2021 Michigan Plumbing Code for commercial and multifamily work, and the 2015 Michigan Residential Code for one- and two-family homes. The 2024 plumbing code isn’t in effect yet. Here’s which book to buy, where to get it, and where to read it free.

    The current Michigan plumbing code book

    • LARA lists the 2021 Michigan Plumbing Code as the current code, effective March 12, 2024, and notes that “Residential requirements are contained in the Michigan Residential Code” (LARA code books).
    • The rule in force adopts the International Plumbing Code (IPC), “2021 second printing edition, including appendices B, C, D, and E,” minus a list of excluded sections (R 408.30701). Michigan then amends many IPC sections in R 408.30711–30796. A plain 2021 IPC book doesn’t have those Michigan amendments, so use the Michigan edition or keep the Part 7 rules with your IPC.
    • When the rules were adopted, the book could be bought from the International Code Council (ICC) through the bureau’s website for $87.50, and it can be inspected at the Bureau of Construction Codes office, 611 West Ottawa Street, Lansing (R 408.30701). The ICC sets the current price.

    Houses use a different book

    The Michigan Plumbing Code’s scope sends detached one- and two-family homes, and townhouses no more than 3 stories high with separate means of egress, to the Michigan Residential Code (R 408.30711, section 101.2 exception). For that work you need the 2015 Michigan Residential Code. LARA lists it as current, effective February 8, 2016 (LARA code books), and it stays in effect while a court order blocks the 2021 update (LARA Currently Open Rules). LARA also posts a free 2015 Michigan Residential Code Errors and Conflicts document. Keep it with that book.

    Where to buy, and where to read free

    The 2024 Michigan Plumbing Code: not yet

    The 2024 IPC rule set has final rules posted, but the 2025-8 LR tracker still shows Filing date: Pending and Effective date: Pending as of Nov 19, 2026. The final rule language says the rules take effect 120 days after filing. It would adopt the IPC “2024 first printing: June 2023 edition,” exclude appendices A and F, and make appendix E mandatory. A 2024 IPC book isn’t the Michigan code until that happens.

    A new book also means a course

    When the state construction code changes, master and journey plumbers must complete a board-approved course on the update within 12 months of the change to renew (MCL 339.6113(2); MCL 339.6115(3)). Plan that once the 2024 rules have an effective date.

    What to do

    • Commercial or multifamily: get the 2021 Michigan Plumbing Code, or a 2021 IPC plus the Part 7 Michigan amendments.
    • Houses: get the 2015 Michigan Residential Code and LARA’s errors and conflicts sheet.
    • Hold off on treating a 2024 book as the Michigan code until the 2025-8 LR tracker shows a filing date.

    Sources: LARA code books · R 408.30701–30796 · R 408.30500–30547g · LARA Currently Open Rules · 2025-8 LR tracker · MCL 339.6113

    More for Plumbing contractors: Michigan Plumbing updates.

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan mechanical code ventilation and exhaust: what Michigan changes

    For ventilation on commercial and multifamily work, Michigan uses the 2021 International Mechanical Code (IMC) Chapter 4 as published. Michigan doesn’t rewrite any of it. Where Michigan does change things is on the exhaust side: where exhaust and dryer ducts can terminate, how dryer ducts are supported, and how kitchen hoods are tested. Houses follow the Michigan Residential Code, which has its own exhaust amendments. A pending 2024 IMC rule set would drop the commercial exhaust amendments. Here’s what is in force as of Nov 19, 2026 and what’s pending.

    Which code covers ventilation

    • The Michigan Mechanical Code is the 2021 IMC, adopted by reference except for a short list of sections (R 408.30901a). None of the excluded sections are in Chapter 4 (Ventilation), and none of Michigan’s Part 9A amendment rules change a Chapter 4 section, so the 2021 IMC ventilation text applies as written (R 408.30901–408.30998).
    • LARA lists the 2021 Michigan Mechanical Code as current, effective March 12, 2024, and notes that “Residential requirements are contained in the Michigan Residential Code” (LARA code books).
    • Michigan adds a definition of “occupiable space” to the code: a room or enclosed space designed for human occupancy where people gather or work, “equipped with means of egress, heat, light, and ventilation facilities.” It doesn’t include spaces meant mainly for other uses, such as storage rooms and equipment rooms (R 408.30905a).

    Michigan exhaust amendments (commercial, in force)

    Michigan rewrites IMC sections 501.3, 504.4 and 504.9.2 (R 408.30945a):

    • Exhaust discharge (501.3): exhaust air must go outdoors where it won’t cause a public nuisance and can’t readily be drawn back in by a ventilating system. “Air shall not be exhausted into an attic or a crawl space, be directed onto walkways, or terminate within 3 feet of a ventilated section in a soffit.” Exceptions: whole-house attic fans in dwelling units with private attics, commercial cooking recirculating systems, and listed and labeled domestic ductless range hoods installed per the manufacturer’s instructions where Chapter 4 ventilation is otherwise provided.
    • Dryer exhaust termination (504.4): terminate outside the building, not within 3 feet of a ventilated soffit section, with a back-draft damper and no screen. Don’t use sheet metal screws or other fasteners that block the airflow, and don’t connect the duct to a vent connector, vent or chimney.
    • Dryer duct support (504.9.2): support and secure dryer exhaust ducts every 4 feet, install the insert end in the direction of airflow, and use no screws or fasteners that stick into the duct.

    Kitchen hoods: Michigan’s capture and containment test

    Michigan adds section 507.6.1.1. The field capture and containment test in 507.6.1 must follow the Bureau of Construction Codes’ smoke testing procedures, which are free from the bureau (R 408.30935a).

    Permits

    Michigan’s permit exemption list includes “portable ventilation appliances and equipment.” Fixed ventilation and exhaust systems aren’t on that list (R 408.30906a, section 106.2(b)).

    Houses: Michigan Residential Code exhaust rules

    One- and two-family homes fall under the 2015 Michigan Residential Code, which is still in effect under the court stay on the 2021 update (LARA Currently Open Rules). Its Michigan amendments (R 408.30500–408.30547g):

    • Exhaust openings (R303.5.2, R 408.30544): not directed onto walkways, not within 3 feet of a ventilated soffit section, and located so they don’t create a nuisance.
    • Dryer duct termination (M1502.3, R 408.30507): outside the building and per the dryer manufacturer’s instructions. If the instructions don’t say where, at least 3 feet in any direction from openings into buildings or a ventilated soffit section. A backdraft damper is required and a screen isn’t allowed.
    • Dryer duct support (M1502.4.2, R 408.30541a): supported at 4-foot intervals, insert end in the direction of airflow, and no screws that stick into the duct.

    Pending: the 2024 IMC rule set

    The 2025-7 LR tracker still shows Filing date: Pending and Effective date: Pending as of Nov 19, 2026. The rules take effect 120 days after filing. The final rule language would:

    • adopt the 2024 IMC, with appendices A, D and E as permissive guidelines only
    • rescind R 408.30945a, the Michigan exhaust and dryer amendments above, along with R 408.30947b
    • keep the “occupiable space” definition
    • amend 1109.3.2: refrigerant pipe shafts with A2L or B2L systems must be naturally or mechanically ventilated, and shafts with any A2, A3, B2 or B3 system must be continuously mechanically ventilated with a refrigerant detector. Detector-activated ventilation must start at no more than 25% of the refrigerant’s lower flammable limit.

    None of this is in force until the tracker shows a filing date. Until then, follow the 2021 rules above.

    What to do

    • For commercial ventilation rates and Chapter 4 requirements, work from the 2021 IMC text. Michigan doesn’t change it.
    • Keep exhaust and dryer terminations at least 3 feet from ventilated soffits, out of attics and crawl spaces, and off walkways. Support dryer ducts every 4 feet.
    • Get the BCC smoke test procedure before a commercial hood test.
    • Watch the 2025-7 LR tracker for a filing date.

    Sources: R 408.30901–408.30998 · R 408.30500–408.30547g · LARA code books · LARA Currently Open Rules · 2025-7 LR tracker

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan Residential Code: stairs, decks and smoke alarms

    Searching for the Michigan stair, deck or smoke alarm rules for a house? The code that applies to one- and two-family homes right now is the 2015 Michigan Residential Code, which is the 2015 International Residential Code (IRC) with Michigan’s changes. This page covers the Michigan changes for stairs, deck ledgers and smoke alarms, quoted from the rules in force. Look up all other details in the code book.

    Which residential code applies

    • Michigan adopts the 2015 edition of the IRC by reference, minus a list of excluded sections, as the Michigan Residential Code (R 408.30500). LARA’s code books page lists the 2015 Michigan Residential Code as the current code, effective February 8, 2016 (LARA code books).
    • The 2021 IRC update is on hold. LARA says a July 7, 2025 Michigan Court of Claims order blocks it from carrying out the 2021 residential rule set while the case continues, and the 2015 versions “will remain valid and in effect” while that order is in place (LARA Currently Open Rules; 2022-16 LR tracker).

    Everything below is from the Part 5 rules in force as of Nov 19, 2026 (R 408.30500–408.30547g).

    Stairs: riser height and tread depth

    Michigan rewrites the IRC riser and tread rules (R 408.30519, printed as R311.7.5.1 and R311.7.5.2):

    • Riser height: “The maximum riser height shall be 8 1/4 inches.” The tallest riser in a flight can’t exceed the smallest by more than 3/8 inch.
    • Tread depth: “The minimum tread depth shall be 9 inches.” The deepest tread in a flight can’t exceed the shallowest by more than 3/8 inch.
    • Winder treads: at least 10 inches deep measured 12 inches from the narrow side, and at least 6 inches deep at any point. Within a flight, winder depths at the 12-inch walk line can’t differ by more than 3/8 inch.

    Michigan’s Part 5 rules don’t change the IRC’s stair width, headroom, handrail or guard sections. Those come straight from the 2015 IRC text, so check the code book for them.

    Exit and interior doors

    Under the same egress rule, the required exit door must be a side-hinged door at least 3 feet wide and 6 feet 8 inches high. Other exterior hinged or sliding doors must be at least 24 inches wide and 6 feet 6 inches high. Interior doors must also be at least 24 inches wide and 6 feet 6 inches high, except doors to areas under 10 square feet (R 408.30518).

    Decks

    • Ledger fasteners: Michigan replaces IRC figure R507.2.1(1), which shows where lag screws and bolts go in deck ledgers and band joists (R 408.30523). Use the Michigan figure, not the one in a plain IRC book.
    • Ledger flashing: Michigan adds R507.2.4: “An approved corrosion resistant flashing as required by Section R703.8 shall be installed above the attached ledger as shown in figure R507.2.1(2) or as approved.” Figure R507.2.1(2) is also Michigan’s own version (R 408.30523a).
    • Some IRC deck items are excluded: Michigan’s adoption rule leaves out several IRC deck provisions, including table R507.2.3 and IRC figure R507.2.1(2), and puts the Michigan versions above in their place (R 408.30500).
    • Permits: a deck needs no building permit only if it meets every one of these conditions: 200 square feet or less, no more than 30 inches above grade at any point, not attached to the house or an accessory structure, not within 36 inches of either, and not serving any entry or exit door (R 408.30505, R105.2). An attached deck needs a permit.

    Smoke alarms

    Michigan rewrites several IRC smoke alarm sections (R 408.30546):

    • Locations (R314.3): in each sleeping room or in the immediate vicinity of the sleeping room, and on each additional story, including basements and habitable attics but not crawl spaces or uninhabitable attics. In a split level with no door between the levels, one alarm on the upper level covers the lower level if the lower level is less than one full story below.
    • Interconnection (R314.4): when more than one alarm is required in a dwelling unit, they must be interconnected so one sets off all. Listed wireless alarms that all sound together meet this. Alarms in existing areas don’t have to be interconnected.
    • Remodels and additions (R314.2.2): when permitted alterations, repairs or additions happen, or a sleeping room is added or created, the dwelling unit needs smoke alarms placed as required for new homes. The exceptions are exterior work (roofing, siding, windows, doors, adding a porch or deck) and electrical, plumbing or mechanical work.
    • Homes built before November 6, 1974 that aren’t getting permitted work need alarms in each sleeping room and on each floor level, including the basement. Battery-operated alarms are one of the allowed power sources for these homes (R314.3.2 and R314.3.3).
    • Upkeep: the owner is responsible for proper operation, testing and maintenance. In rentals, the occupant handles periodic testing and cleaning. A failed system must be repaired and working within 30 days (R314.3.3).

    Carbon monoxide alarms

    When work that requires a building permit happens in an existing house that has an attached garage or fuel-fired appliances, CO alarms must be added per R315.1 (R 408.30520).

    What to do

    • Build stairs to Michigan’s 8 1/4-inch maximum riser and 9-inch minimum tread. Check everything else on stairs against the 2015 IRC text.
    • Use Michigan’s ledger fastener figure and flash every attached ledger. Pull a permit for any attached deck.
    • On any permitted remodel or addition, apart from the exempt exterior and trade work, plan to bring smoke alarms up to new-home placement, plus CO alarms where the house has an attached garage or fuel-fired appliances.
    • Watch the LARA Currently Open Rules page for changes to the court stay.

    Sources: R 408.30500–408.30547g · LARA code books · LARA Currently Open Rules · 2022-16 LR tracker

    More for builders: Michigan Builders updates.

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan plumbing code venting under the 2021 IPC

    Michigan’s plumbing venting rules come from the 2021 International Plumbing Code as amended in Part 7 of the Construction Code. Houses follow the residential code instead. The 2024 IPC adoption is still waiting to be filed — it is not the code in force today.

    Why it matters

    • Current rules adopt the international plumbing code, 2021 second printing (with listed Michigan exceptions) as the Michigan Plumbing Code (R 408.30701).
    • Amended section 101.2 sends detached 1- and 2-family dwellings and townhouses not more than three stories with separate means of egress, and their accessory structures, to the Michigan Residential Code for plumbing (R 408.30711, section 101.2). Use that residential text for house jobs.
    • Rule set 2025-8 LR would move Michigan to the 2024 IPC. As of Nov 5, 2026, its Filing date and Effective date are both Pending (final rules and JCAR package are posted). It takes effect 120 days after filing once filed. Until then, design and inspect to the 2021 IPC as amended.

    Where to read the adopted IPC text

    Michigan’s Admin Code states the amendments and which model-code sections are adopted or excepted. For the model IPC wording Michigan did not rewrite — including Chapter 3 pipe support / hanger provisions — use the free ICC Digital Codes Michigan viewer named on MCB’s resources list (codes.iccsafe.org/codes/united-states/michigan) or buy the book through LARA’s code-books channel referenced in R 408.30701. The Michigan amendments below are quoted from the Admin Code PDF.

    Trap-to-vent distance and fixture-drain vents

    Michigan amends IPC section 909.1:

    • 909.1 Distance of trap from vent. Each fixture trap shall have a protecting vent located so that the slope and the developed length in the fixture drain from the trap weir to the vent fitting are within the requirements in table 909.1 (R 408.30723).

    Michigan amends section 909.2:

    • 909.2 Venting of fixture drains. The vent for a fixture drain, except where serving a fixture with integral traps such as water closets, shall connect above the weir of the fixture trap being vented. The total slope shall not exceed the diameter of the fixture drain (R 408.30725c).

    Use table 909.1 from the adopted 2021 IPC for the developed-length numbers; Michigan points to that table rather than reprinting it in the Admin Code.

    Combination waste and vent

    Michigan adds section 915.1:

    • A combination waste and vent system shall not serve fixtures other than floor drains, sinks, lavatories and drinking fountains. Combination waste and vent systems shall not receive the discharge from a food waste disposer or clinical sink (R 408.30725d).

    Roof terminations and frost closure

    Michigan’s roof and exterior vent amendments:

    • 903.1 Roof extension. Open vent pipes through a roof terminate at least 1 foot (305 mm) above the roof, except that if the roof is used for any purpose other than weather protection, vent extensions run not less than 7 feet (2134 mm) above the roof (R 408.30753a).
    • 903.1.1 Roof extension unprotected. Open vent pipes through a roof terminate not less than 12 inches (304.8 mm) above the roof (R 408.30753b).
    • 903.2 Frost closure. To prevent frost closure, every vent extension through a roof shall be a minimum of 3 inches (76 mm) in diameter. Any increase in vent size shall be made inside the building a minimum of 1 foot (305 mm) below the roof or inside the wall (R 408.30754a).
    • 903.7 Extensions outside a structure. Vent pipes installed on the exterior of the structure shall be protected against freezing by insulation or heat, or both (R 408.30754b).

    Hanger and pipe-support spacing

    Part 7’s Michigan amendments reviewed Nov 5, 2026 do not rewrite the IPC pipe-hanger or support spacing tables. Those spacing rules remain the adopted 2021 IPC text (commonly Chapter 3 general regulations / pipe support). Do not treat trade-press summaries as the Michigan rule. Open the adopted IPC in the ICC Michigan free viewer or the purchased Michigan Plumbing Code book, and follow any jobsite instructions from the enforcing agency.

    What to do

    • On commercial and multifamily work under the Michigan Plumbing Code, apply the Michigan amendments above first, then the rest of the 2021 IPC as adopted.
    • On 1- and 2-family houses, switch to the Michigan Residential Code plumbing chapters (101.2).
    • Watch the 2025-8 LR tracker for a filing date before you train crews on 2024 IPC venting changes.

    Sources: R 408.30701–30796 · 2025-8 LR tracker · ICC Digital Codes: Michigan

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Plumbing contractors: Michigan Plumbing updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 5, 2026. Confirm with LARA or your local building department before you act.

  • Michigan fire alarm license: specialty technician and contractor

    Michigan treats fire alarm work as its own electrical specialty. Unless you already hold a qualifying electrical license, you need fire alarm specialty credentials before you install, alter, repair, service or maintain fire alarm system wiring and equipment.

    Why it matters

    • Except as otherwise provided in section 737, a person shall not erect, install, alter, repair, service or maintain fire alarm system wiring, devices, appliances or equipment in a building or structure without a license (MCL 339.5731(3)).
    • A “fire alarm system” is a system designed to detect and annunciate fire or by-products of fire in a building or structure. It does not include a single-station smoke detector (MCL 339.5701(k)).
    • A person that already holds a valid electrical contractor, master electrician, electrical journeyman license or apprentice electrician registration is not required to hold specialty licenses to perform specialty installations (MCL 339.5725). The fire alarm specialty path is for firms and technicians who are not working under those electrical credentials.

    Fire alarm specialty technician (FAST)

    The department issues a fire alarm specialty technician’s license to an individual who is at least 20 years old, meets Article 2 requirements, and is certified by NICET as an associate engineering technician, level II, or holds an equivalent certification in fire alarm systems technology as determined by the board (MCL 339.5721(1)).

    LARA’s electrical licensing page restates that you need NICET certification in installation and repair at Level II or higher, or an ESA Certified Fire Alarm Technician (CFAT) Level II or higher (LARA electrical licensing). Apply on LARA’s fire alarm / journeyman / master examination application; pathway rules say applicants for fire alarm specialty technician licensure submit the application, fee, proof of the most recent code-update course when applicable, then pass the exam after approval (LARA pathway to licensure).

    As a condition of renewal, the technician must complete a board-approved course on any update or change in the state construction code relating to fire alarm systems within 12 months after that update or change — only in years the code actually changes (MCL 339.5721(2)). One FAST license holder cannot be used to qualify more than one fire alarm contractor (MCL 339.5721(3)). LARA notes that without an associated FAST, a fire alarm contractor’s license is put on hold (LARA electrical licensing).

    Fire alarm contractor

    Subject to MCL 339.5731(3), the department issues a fire alarm contractor’s license to a person that meets Article 2 and either:

    • Is an individual who holds a fire alarm specialty technician’s license, or
    • Has at least one full-time employee who is a fire alarm specialty technician, resides in this state, and is actively in charge of and responsible for Michigan electrical code compliance of all fire alarm system wiring and equipment installations

    (MCL 339.5719). LARA describes the contractor license as required to do business as a FAST and requires the associated FAST to stay responsible for code compliance (LARA electrical licensing).

    Apprentice technicians

    An individual employed as a fire alarm specialty apprentice technician must register with the board within 30 days after employment. The department issues a registration certificate on proof of participation in a board-approved apprenticeship training program. The jobsite ratio is 1 fire alarm specialty technician to 2 registered apprentice technicians (MCL 339.5723). Use LARA’s electrical or FAST apprentice application (LARA electrical licensing).

    Fees and renewal dates

    From MCL 339.5707:

    • Examination fee for fire alarm contractor or fire alarm specialty technician: $100
    • Initial or renewal fire alarm specialty technician license: $50; apprentice registration: $15
    • Fire alarm contractor license: $300 for a three-year cycle (expires December 31 of every third year; renewable not later than March 1 of the renewal year)
    • Specialty technician licenses expire December 31 each year and may be renewed not more than 60 days after that date with the fee; after March 1 a non-renewed license is void and needs relicensure
    • Apprentice registration expires August 31 each year

    LARA’s renewals page covers online renewal for these electrical specialty licenses (LARA renewals).

    What to do

    • If you already hold electrical contractor / master / journeyman / apprentice credentials, MCL 339.5725 may cover fire alarm installs without a separate specialty license — confirm your license type before you bid.
    • Otherwise, earn NICET Level II (or ESA CFAT Level II+), apply for the FAST exam/license, then associate that FAST with one fire alarm contractor.
    • Register apprentices within 30 days and keep the 1-to-2 jobsite ratio.

    Sources: MCL 339.5701 · MCL 339.5719 · MCL 339.5721 · MCL 339.5723 · MCL 339.5725 · MCL 339.5731 · MCL 339.5707 · LARA electrical licensing

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Electrical contractors: Michigan Electrical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 5, 2026. Confirm with LARA or your local building department before you act.

  • Michigan boiler license requirements: installer and repairer classes

    If you install or alter boilers in Michigan (outside the residential carve-outs), you need a boiler license and a state boiler permit before the work starts. This page covers how to get licensed — not how to renew. Renewals are every Dec 31; see the related renewal post below.

    Why it matters

    • LARA’s boiler permit page states that installation and repairs of boilers and high-pressure piping may be done only by persons licensed by the Boiler Section, and that permits will not be issued to unlicensed persons (LARA boiler permit information).
    • Under the Skilled Trades Regulation Act, a person shall not install or alter a boiler without first obtaining a permit from the boiler division. You are not eligible for that permit if you are not licensed under the boiler article, and unlicensed individuals may perform permit work only under the immediate supervision of a licensee (MCL 339.5939).
    • The boiler article does not apply to certain boilers, including steam or vapor boilers at not more than 15 psig in a private residence or in an apartment of fewer than six families, and hot-water boilers at not more than 160 psig or 250°F in those same locations, plus other listed exemptions such as agricultural and federal-control boilers (MCL 339.5915). If the boiler is outside that list, plan on licensing and permits.

    Installer and repairer experience (rules in force)

    Current skilled-trades rules require a boiler installer or repairer license as required by MCL 339.5939 (R 339.5173):

    • Installer: at least 5 years of experience in all phases of boiler installation in the class you are applying for. Up to 2 years credit may be given for 2 years of experience in the design, construction, manufacture or inspection of boilers.
    • Repairer: at least 5 years of experience in all phases of boiler repair in that class. Up to 3 years credit may be given for 3 years of design, construction, manufacture or inspection experience.

    LARA’s pathway page adds: submit an application and fee, get approved to test, then pass the exam; hold your current boiler license at least one year before upgrading classifications (LARA pathway to licensure). Written license exams require a score of 75% (R 339.5114). PSI administers installer/repairer exams after LARA approval; pay exam fees to PSI when you schedule (LARA boiler licensing page).

    Installer classes

    Class scope is in R 339.5174 and restated on LARA’s boiler licensing page:

    • 1B: low-pressure boiler not exceeding 1,000,000 BTU/hour firing rate (modular sum also capped at that rate)
    • 2B: low-pressure boiler of any capacity or firing rate, plus 1B work
    • 3B: power boiler ≤ 5,000 lb steam/hour; install/replace non-boiler external piping (ASME B31.1 / R 339.5209); plus 2B work
    • 4B: power boiler ≤ 300,000 lb steam/hour; non-boiler external piping; plus 3B work
    • 5B: power boiler of any capacity except nuclear heat source; non-boiler external piping; plus 4B work
    • 6B: nuclear heat-source boiler (extra federal/ASME evidence required)
    • P: install or replace (and, for repairer P, repair) non-boiler external piping only

    Repairer classes

    From R 339.5175:

    • I: repair a low-pressure boiler by means other than welding, riveting or other fabrication
    • II: repair low-pressure, hot-water supply and fire-tube boilers of any pressure; plus Class I
    • III: repair high-pressure boilers; repair or replace non-boiler external piping; plus Class II
    • IV: repair or field-erect a boiler of any pressure except nuclear heat source; non-boiler external piping
    • V: erect and repair nuclear heat-source boilers (ASME N-type stamp evidence required)
    • P: non-boiler external piping only

    Match the class to the boiler you will actually work on before you apply.

    Fees (current rules)

    R 339.5176 sets installer and repairer license, examination and renewal fees at $100 each. Permit application fees in the same rule include $100 for a low-pressure installation permit and $130 plus $0.06 per foot of piping for a high-pressure installation permit, among others. Apply online through Accela when you can (LARA boiler permits; aca-prod.accela.com/LARA).

    Pending rules (not in force)

    Two related rule sets still show Filing date: Pending and Effective date: Pending as of Nov 5, 2026:

    • Boiler Code rewrite — 2025-64 LR tracker (final rules + JCAR package posted; takes effect 90 days after filing once filed)
    • Skilled Trades Regulation Rules rewrite — 2025-58 LR tracker (same status). Its final R 339.5173 text would require “not less than 5 years and 10,000 hours” of experience with notarized employer statements. That hour figure is not in the Admin Code in force today; treat it as pending until the tracker shows a filing date.

    What to do

    • Confirm whether MCL 339.5915 takes the boiler out of the article. If not, pick the installer or repairer class that matches the equipment.
    • Document your five years in that class, apply through LARA/Accela, then schedule PSI.
    • Do not start install or alteration work until the boiler division issues the permit (MCL 339.5939).

    Sources: MCL 339.5915 · MCL 339.5939 · R 339.5101–5412 · LARA boiler licensing · LARA boiler permits · 2025-64 LR · 2025-58 LR

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 5, 2026. Confirm with LARA or your local building department before you act.

  • Michigan building permit exemptions: what does not need a permit

    Before you dig, frame or finish, Michigan law says you need a building permit — unless a statute or the code carves out an exemption. Guessing wrong means stop-work orders and rework. Here is what the primary sources actually exempt, and what they do not.

    Why it matters

    • Except as otherwise provided in Act 230 or the code, construction or alteration of a building or structure shall not be commenced until a building permit has been issued (MCL 125.1511(1)).
    • The enforcing agency has 10 business days to act on an application (15 for an unusually complicated building). Silence is treated as a denial for appeal purposes (MCL 125.1511(1)).
    • Exemptions from a permit are not a free pass to ignore the code. Michigan’s amended section 105.2 says exemptions “shall not be deemed to grant authorization for work to be done in any manner in violation of the provisions of the code or other laws or ordinances” (R 408.30409; same rule for houses in R 408.30505).

    Permit exemptions in Act 230 (statute)

    MCL 125.1510 is the building-permit application section. It also states these permit rules:

    • Ordinary repairs: “A building permit is not required for ordinary repairs of a building or structure” (MCL 125.1510(7)). The statute does not define “ordinary repairs” further.
    • Agricultural incidental buildings: No building permit for a building incidental to agricultural use of the land if it is not used in the business of retail trade (MCL 125.1510(8)).
    • Qualifying roadside stand: Exempt from the act’s plumbing-fixture requirements and need not have electric power; if it has power, the electrical code still applies. It is not exempt from needing a building permit (MCL 125.1510(9)). “Qualifying” means seasonal retail of agricultural products, at least 50% from a farm the stand owner controls, not larger than 400 square feet, and securely anchored.
    • Certain tents: A tent that meets the roadside-stand product and size tests in (9)(a)–(c) is exempt from Act 230 and the code (MCL 125.1510(10)).

    Everything else still starts with the written application in MCL 125.1510(1) unless the code lists another exemption.

    Code list: Michigan Building Code (2021 IBC as amended)

    Part 4 of the Construction Code adopts the 2021 International Building Code with Michigan amendments (R 408.30401, effective April 9, 2025). R 408.30409 rewrites section 105.2. Building permits are not required for, among other listed items:

    • One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, if the floor area does not exceed 120 square feet
    • A fence not more than 7 feet high
    • A retaining wall not more than 4 feet high (bottom of footing to top of wall), unless it supports a surcharge or impounds Class I, II or III-A liquids
    • A water tank on grade, capacity not greater than 5,000 gallons, height-to-diameter (or width) ratio not greater than 2 to 1
    • A sidewalk or driveway not more than 30 inches above adjacent grade, not over a basement or story below, and not part of an accessible route
    • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
    • Prefabricated swimming pools accessory to Group R-3 (as applicable in section 101.2) that are less than 24 inches deep, not greater than 5,000 gallons, and installed entirely above ground
    • Shade cloth structures for nursery or agricultural purposes (not including service systems)
    • Swings and other playground equipment accessory to detached 1- and 2-family dwellings
    • Window awnings in Group R-3 and U that project not more than 54 inches and need no additional support
    • Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches high

    The same rule lists separate electrical, mechanical and plumbing items that do not need those trade permits (for example, stopping leaks in drains without replacing concealed piping). Read the full text in R 408.30409 before you skip a trade permit.

    Houses: Michigan Residential Code list (different sizes)

    Detached 1- and 2-family dwellings and their townhouses follow the Michigan Residential Code. R 408.30505 amends section R105.2. Building permits are not required for a shorter list that includes:

    • One-story detached accessory structures if the floor area does not exceed 200 square feet (larger than the Building Code’s 120-square-foot limit)
    • Fence ≤ 7 feet; retaining wall ≤ 4 feet (unless supporting a surcharge); grade-supported water tank ≤ 5,000 gallons with height-to-width ≤ 2:1; sidewalk/driveway rules similar to the Building Code; finish work; small above-ground pools; swings/playground equipment; limited window awnings
    • Decks, porches, patios, landings or similar structures not exceeding 200 square feet, not more than 30 inches above grade at any point as prescribed by Section R312.1.1, not attached to a dwelling or its accessory structures, not within 36 inches of a dwelling or its accessory structures, and not serving any ingress or egress door

    If your deck is attached, taller, larger or serves a door, that residential exemption does not apply. Ask the local enforcing agency.

    Do not confuse license exemptions with permit exemptions

    MCL 339.2403 lets certain people act as a residential builder or maintenance-and-alteration contractor without that occupational license — for example, an owner building for their own use and occupancy, rental-property maintenance by the owner, a project with an aggregate contract under $600 (with anti-evasion language), or a licensed electrical, plumbing or mechanical contractor doing only their trade work. Those are licensing exemptions under the Occupational Code. They do not, by themselves, waive the building permit under Act 230 or the code lists above. You can be license-exempt and still need a permit, or permit-exempt and still need a license for other work.

    What to do

    • Match the building type: Residential Code list for houses and their accessory structures; Building Code list for other buildings.
    • If the work is not clearly on the statute or Admin Code list, apply before you start (MCL 125.1511).
    • Call or email the local building department when “ordinary repairs” or a borderline deck/shed is in doubt — the enforcing agency reads the same primary text.

    Sources: MCL 125.1510 · MCL 125.1511 · MCL 339.2403 · R 408.30401–30499a · R 408.30500–30547g

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Nov 5, 2026. Confirm with LARA or your local building department before you act.

  • Michigan electrical apprentice registration: how to register and renew

    Electrical apprentices in Michigan don’t hold a license. They hold a registration. Here’s how it works and when it’s due, straight from the Skilled Trades Regulation Act and LARA.

    Who has to register, and when

    • An individual employed as an apprentice electrician must register within 30 days after employment (MCL 339.5717(1)).
    • The state issues the registration on proof that you’re in an apprenticeship training program the board approves (MCL 339.5717(2)). The board approves bona fide programs that meet or exceed U.S. Department of Labor Office of Apprenticeship requirements (MCL 339.5717(4)).
    • LARA says you need to be employed by a master electrician and an electrical contractor (sometimes the same person), and be enrolled in a related technical instruction (RTI) program (LARA electrical licensing).
    • Working in the City of Detroit? LARA says Detroit issues its own electrical licenses and registrations. Contact the city.

    How to apply

    • Use LARA’s Application for Electrical Apprentice or Fire Alarm Specialty Technician Apprentice (BCC-0704).
    • It needs three signatures: you, your sponsoring employer (master or contractor of record), and your RTI provider (a school, labor organization or your employer).
    • The employer section asks for the company’s contractor license number, your hire date and the master’s license number.
    • The fee is $15, non-refundable (MCL 339.5707(2)(c); BCC-0704). The form has a military/uniformed services fee waiver with proof of service.
    • Put your own contact information on it, not your employer’s (BCC-0704).

    The jobsite ratio

    No more than 3 registered apprentices per electrical journeyman or master electrician, enforced on a jobsite basis (MCL 339.5717(3)).

    Renewal: every August 31

    • An apprentice electrician registration expires August 31 each year. You must show a sponsoring employer for initial or renewal registration (MCL 339.5707(5)).
    • From LARA’s renewals page: you can renew starting 90 days before expiration. Log in to Accela and give your employer’s master/contractor license numbers. Express Pay doesn’t work for apprentices.
    • Renewal fee: $15. LARA lists a $100 late fee if you don’t renew on time.
    • You must have completed, or be currently enrolled in and attending, an apprenticeship program. No code-update course is required to renew.
    • Even if it’s been a long time, LARA says you renew instead of applying for a new registration. Don’t use BCC-0704 to renew.
    • LARA: you can’t be on the job site with an expired apprentice registration.

    Coming up: pending Skilled Trades rules

    The Skilled Trades Regulation Rules rewrite (2025-58 LR) has final rule language posted Sept 29, 2026. As of Oct 19, 2026, Filing and Effective dates are Pending; it takes effect 90 days after filing (state rule tracker). Two lines in the final language matter for apprentices. Neither is in effect yet:

    • “All hours submitted to sit for an electrical journeyman examination must be as a registered apprentice required under section 731(1) of the act” (final R 339.5151(4)). In plain terms: hours worked without an apprentice registration wouldn’t count toward sitting for the journeyman exam.
    • An apprentice registrant who renews more than 60 days late would pay a $20 late renewal fee “unless otherwise specified in the act” (final R 339.5116(2)).

    For reference, the journeyman license itself needs at least 8,000 hours over at least 4 years under the direct supervision of a licensee, and the applicant must be at least 20 (MCL 339.5715(1)).

    What to do

    • Contractors: register every new apprentice within 30 days of hire. Keep a copy of the signed BCC-0704.
    • Count heads on each site. One licensed journeyman or master for every 3 apprentices, max.
    • Put August 31 on the shop calendar. Renewal opens about 90 days earlier.
    • Check a registration any time in LARA’s license lookup (License Type: Electrical Apprentice).

    Sources: MCL 339.5717 · MCL 339.5707 · LARA electrical licensing · LARA renewals · 2025-58 LR tracker

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Electrical contractors: Michigan Electrical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 19, 2026. Confirm with LARA or your local building department before you act.

  • How to look up a Michigan plumbing license

    Need to check a plumber’s license in Michigan? LARA’s Bureau of Construction Codes has a free public lookup. Use it before you hire a sub, take on a journey plumber, or let someone pull a permit on your job.

    Why it matters

    • Only a licensed master or journey plumber may perform plumbing, apart from the exceptions in the law. A licensed master plumber must be in charge, and the responsible plumbing contractor must get the permit (MCL 339.6107(1)).
    • A license or registration lapses the day after its expiration date. After that, the person can’t practice or use the title until it’s renewed (MCL 339.411(1)). Late renewal is allowed within 60 days with a late fee (MCL 339.411(2)).

    How to look up a plumbing license

    1. Open LARA’s Find / Verify a BCC Licensed Professional or Business search (Accela). It’s free and needs no login.
    2. Pick the License Type. The plumbing choices are Plumbing Apprentice, Plumbing Journey, Plumbing Master and Plumbing Contractor (there’s also a Plumbing Affidavit type).
    3. Search by License Number if you have it. Otherwise use Last Name and First Name, or Business Name for a company. City and Zip help narrow a common name.
    4. Read the results table: License Number, License Type, Business Name, name, License Expiration Date, City, State and Zip. Click a result for more details. You can also download the results.

    Watch out: the search returns expired licenses too. In a test search on Oct 19, 2026, results included plumbing contractor licenses with expiration dates years in the past. A listing alone doesn’t mean the license is active. Check the date.

    Reading the expiration date

    From LARA’s license renewals page:

    • Master plumber and plumbing contractor: renew every three years by April 30. Not everyone renews in the same year.
    • Journey plumber and apprentice plumber: renew every year by April 30.
    • Plumbing contractor license numbers start with 80. If someone holds both the contractor and the qualifying master license, renewing the contractor number renews both.

    So a journey plumber whose record shows an expiration date of April 30, 2026 or earlier, and no newer date, has a lapsed license under MCL 339.411 unless LARA’s record shows a renewal.

    Coming up: “on hold” contractor records

    Today, if a master plumber stops representing a plumbing contractor, the contractor license may be summarily suspended until a new master is designated (current R 339.5411(2)).

    The pending Skilled Trades rules rewrite would change that wording. The final rule language says the contractor license “is placed in abeyance and displays as on hold in the department’s public record,” and no further permits issue while it’s on hold (final R 339.5411(2), state rule tracker, 2025-58 LR). As of Oct 19, 2026, the rule set’s Filing date and Effective date are Pending; it takes effect 90 days after filing. Once it’s in effect, an “on hold” status in the lookup is something to ask about before that contractor pulls your permit.

    What to do

    • Look up every plumbing sub before they start. Match the business name and the Plumbing Contractor number (80…) to the permit.
    • Save a screenshot or the downloaded result in the job file.
    • Check your own crew’s journey and apprentice dates before April 30.

    Sources: LARA BCC license lookup · LARA renewals · MCL 339.6107 · MCL 339.411 · 2025-58 LR tracker

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Plumbing contractors: Michigan Plumbing updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 19, 2026. Confirm with LARA or your local building department before you act.