Author: Tom Smith

  • A2L refrigerants: the basics for R-454B and R-32 work

    New residential and light-commercial equipment has moved to A2L refrigerants, mainly R-454B and R-32. Here’s what EPA says, and where its guidance stops.

    What “A2L” means

    It’s an ASHRAE Standard 34 safety class. The “A” means lower toxicity. “2L” means lower flammability: it can burn, but less readily than an A2 or A3 like propane. EPA’s refrigerant safety page uses the ASHRAE 34 classes.

    EPA’s rules (SNAP)

    • SNAP Rule 23 listed R-452B, R-454A, R-454B, R-454C and R-457A as acceptable, subject to use conditions, for new residential and light-commercial AC and heat pumps. R-32 is listed the same way for that equipment, other than self-contained room ACs.
    • EPA says A2L listings in Rules 23 and 25 require compliance with UL 60335-2-40 Edition 3. Edition 4 equipment is OK to the extent it also meets Edition 3.
    • Charge size: to comply, you must use charge sizes that meet Edition 3, even where Edition 4 allows something different.
    • Labels: both the red GHS flame diamond and the yellow ISO 7010-W021 triangle are consistent with EPA rules.
    • EPA says following ASHRAE Standard 15 “will ensure the safety of technicians and building occupants.”

    Practical habits (general safety, per EPA)

    • Find and fix leaks promptly. Use leak detectors to warn of rising concentrations.
    • Keep exposures low, and check the SDS for each refrigerant.
    • Respect flammability limits. Control ignition sources where refrigerant could collect.
    • Install per the manufacturer’s instructions. A2L equipment often has sensors and mitigation built in.

    Michigan’s A2L rule

    Michigan already allows A2L systems. The current Michigan Mechanical Code, in effect since March 12, 2024, says “System using A2L refrigerants shall comply with ASHRAE 15” and adopts the 2022 edition of ASHRAE 15 (Mich. Admin. Code R 408.30947b and R 408.30901). Houses fall under the Michigan Residential Code, so ask your inspector how they apply it there.

    Not covered here

    • Specific tool and recovery-equipment rules for A2Ls.
    • Training or certification beyond EPA 608.

    Check the manufacturer, your distributor’s training and your inspector on these.

    Example

    You’re quoting your first R-454B heat pump in a small basement mechanical room. Read the installation manual’s minimum room area and charge section before you quote. If the unit needs a mitigation board or sensor, that’s part of the job.

    Sources: EPA SNAP Q&A · EPA SNAP Rule 23 fact sheet · EPA refrigerant safety · EPA restrictions by sector

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • Michigan Residential Code: still stuck in court

    Michigan tried to update its residential code and residential energy code. A court put that on hold. Here’s what applies today.

    What happened

    • LARA finished two rule sets that would adopt parts of the 2021 International Residential Code (IRC) and the 2021 IECC residential standards. They were set to take effect August 29, 2025.
    • On July 7, 2025, the Michigan Court of Claims issued an order in Home Builders Assoc. et al. v. LARA et al. It temporarily stops LARA from “taking additional steps necessary to apply or implement” those two rule sets while the case is pending.
    • While the order stands, the 2015 IRC and IECC residential provisions, as Michigan adopted them, remain in effect.

    As of Oct 15, 2026, LARA’s open rules page still says the 2015 versions “will remain valid and in effect” while the order stands.

    Why an HVAC shop cares

    The residential code covers a lot of house mechanical work: equipment sizing references, duct sealing and insulation, and energy provisions that affect what inspectors check on new homes and additions. For now, keep working to the 2015-based Michigan residential rules on houses.

    The mechanical code is separate (see our IMC explainer). It covers commercial and some residential work and is on its own update track.

    Example

    A builder calls you for a new-construction ranch in Berrien County. They mention “the new 2021 energy code.” Politely correct them. The 2021 residential update is on hold. Design and inspect to the current rules, and confirm with the local inspector.

    What to do

    • Don’t retrain your crew to the 2021 IRC/IECC yet.
    • Watch for the court outcome. If the order lifts, the update could move quickly.

    Source: LARA BCC currently open rules (court order details)

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • Michigan rulemaking roundup: Boiler Code and Skilled Trades rules

    Two Michigan rule sets in the works could touch an HVAC shop. Neither is final, as far as we can confirm.

    1. Part 9A Boiler Code (new rule set)

    • LARA wants to “modernize and update” the boiler rules.
    • It would adopt the 2024 ASME Boiler and Pressure Vessel Code, ASME CSD-1 (controls and safety devices for automatically fired boilers) and the 2023 National Board Inspection Code.
    • It was published in the September 1, 2026 Michigan Register. The hearing was September 10, 2026, and comments closed Sept 11.
    • It takes effect 90 days after filing. As of Oct 15, 2026, the state has not filed it or published an effective date. Final rule text went to the Legislature’s rules committee Sept 29, 2026 (state rule tracker, 2025-64 LR).

    Who cares: shops that install, repair or service boilers. CSD-1 covers controls and safety devices on automatically fired boilers, which is right in a hydronic tech’s lane. The final text is posted on the state rule tracker. Check what changes for your work before it takes effect.

    2. Skilled Trades Regulation rules

    • This is the rule set behind licensing under the Skilled Trades Regulation Act.
    • LARA says it would set “clear and consistent fees and experience requirements” for registrations, licenses and exam applications. It also addresses continuing education, clarifies complaint procedures, and moves the boiler rules out into the new Boiler Code rule set.
    • Same timeline: Register Sept 1, hearing Sept 10, 2026, effective 90 days after filing. As of Oct 15, 2026, not filed and no effective date (state rule tracker, 2025-58 LR).

    Who cares: anyone holding or hiring for a Michigan trades license. Fees or experience rules for new applicants could change. The final text is on the state rule tracker. It isn’t in effect yet, so today’s fees and CE rules still apply.

    Example

    You’re about to sponsor a tech for a mechanical contractor exam in spring 2027. If these rules are filed this winter, the application fee or experience paperwork might be different by then. Check LARA’s page before you submit.

    What to do

    • Subscribe to LARA notices: email LARA-BCC-Rules@michigan.gov with the rule set name in the subject.
    • We’ll report the final text when it’s filed.

    Source: LARA BCC currently open rules

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • VRF systems: January 1, 2027 install cutoff

    Variable refrigerant flow (VRF) systems run on a different schedule from regular splits. If you do any VRF work, this is the date to watch.

    The rule

    Under EPA’s Technology Transitions rule (40 CFR 84.54), new residential and light-commercial VRF systems using refrigerants with a GWP of 700 or higher (R-410A is one) are restricted starting January 1, 2026 for manufacture and import.

    The install allowance:
    – High-GWP VRF systems can be installed until January 1, 2027, if all components were manufactured or imported before January 1, 2026.
    – Longer allowance, until January 1, 2028, if the building had an approved building permit issued before October 5, 2023 that specified the HFC system, and all components were made or imported before Jan 1, 2026.

    The R-410A deadline removal in July 2026 covered non-VRF residential and light-commercial systems. EPA’s table still shows the Jan 1, 2027 VRF date.

    Who this affects

    Mostly commercial and multifamily work: small offices, churches, mixed-use buildings. A small residential shop may never touch it. But if you sub on VRF jobs, or quoted one this year, this is your deadline.

    Example

    You quoted a 6-zone R-410A VRF system for a dental office, install planned for February 2027. That’s past the cutoff unless the building permit predates Oct 5, 2023 and specified it. Talk to the owner now. Pull the install into December, or switch to a lower-GWP system.

    What to do

    • List every open VRF quote and its refrigerant.
    • Confirm component manufacture dates with your distributor.
    • Anything landing after Dec 31, 2026: re-spec it or check the permit-date exception.

    Sources: EPA restrictions by sector · 40 CFR 84.54 (eCFR)

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • R-410A: the federal install deadline is gone

    For two years we heard “you can’t install R-410A after January 1, 2026.” That’s no longer true. EPA removed the deadline.

    What happened

    • EPA’s 2023 Technology Transitions rule set a GWP limit of 700 for new residential and light-commercial AC and heat pump systems. R-410A is well above 700. R-454B and R-32 are under it.
    • New systems like that couldn’t be made or imported after January 1, 2025.
    • A December 2023 interim rule let contractors install leftover inventory through December 31, 2025, if every component was made or imported before Jan 1, 2025.
    • In 2026 EPA finalized a reconsideration rule (published in the Federal Register May 26, 2026, 91 FR 31284). It took effect July 27, 2026 and removed the installation deadline for those qualifying systems.

    What it means for you

    • You can install an R-410A split system, mini-split or packaged unit for residential or light commercial with no federal end date, as long as every specified component was manufactured or imported before January 1, 2025.
    • New R-410A systems still can’t be manufactured or imported. Supply only shrinks from here.
    • Servicing existing R-410A systems is still allowed. EPA kept the ability to use replacement components labeled “for servicing existing equipment only.”

    Practical example

    A customer’s 2012 R-410A heat pump dies. They want the cheapest replacement. Your distributor has a matched R-410A condenser and coil. Check the manufacture date on both. Both pre-2025? Federally, you’re fine. One made after Jan 1, 2025? Don’t install that combo. Keep a photo of the data plates in the job file.

    Don’t over-read it

    This is the federal rule. Michigan’s construction code applies statewide (MCL 125.1508a), and the current Michigan Mechanical Code rules don’t mention R-410A or HFC phase-down dates (Part 9A rules). For A2L refrigerants (R-454B, R-32), the Michigan Mechanical Code says A2L systems “shall comply with ASHRAE 15” (R 408.30947b). Follow the manufacturer’s instructions too.

    What to do

    • Ask your distributor for date codes before you quote R-410A.
    • Keep training techs on A2L equipment. That’s where new product is going.

    Sources: Federal Register, 91 FR 31284 · EPA restrictions by sector · ABC summary

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • Michigan Mechanical Code is moving to the 2024 IMC

    Michigan’s mechanical code is based on the International Mechanical Code (IMC). Right now it’s the 2021 IMC, which took effect March 12, 2024. LARA has proposed moving to the 2024 IMC.

    Where it stands

    • Rule set: Construction Code, Part 9A Mechanical Code (LARA lists it as 2025-7 LR).
    • The proposed rules were published in the July 15, 2026 Michigan Register.
    • The public hearing was August 5, 2026 in Lansing. Written comments closed August 7, 2026.
    • It takes effect 120 days after LARA files it with the Secretary of State.

    Status: As of Oct 15, 2026, the state has not filed these rules or published an effective date. The final rule text went to the Legislature’s Joint Committee on Administrative Rules on Oct 12, 2026 (state rule tracker, 2025-7 LR). Until it’s filed, and for 120 days after, the 2021 IMC still governs.

    Who it affects

    Anyone who pulls mechanical permits in Michigan: residential HVAC, light commercial, hydronics, ductwork. It matters most on jobs permitted around the switchover. Which code applies usually depends on when the permit is applied for. Ask your local building department which edition they’ll apply to permits filed around the switchover.

    What actually changes

    LARA says the rules adopt the 2024 IMC “with amendments, deletions, and additions” for Michigan. They haven’t published a plain summary. The final rule text is posted on the state rule tracker (“Final Rule Language”). We’ll break down the section changes once it’s filed.

    What to do

    • Now: Get on the list. Email LARA-BCC-Rules@michigan.gov with the subject “Subscribe – MECHANICAL”. It’s free.
    • When it’s filed: You’ll have about 4 months. Buy or access the 2024 IMC, read the Michigan amendments, and brief your installers.
    • Michigan mechanical contractors don’t need a code-update course for their license, per LARA. The training is on you.

    Example

    You quote a light-commercial rooftop replacement in January for a spring install. If the 2024 IMC takes effect in between, ask the local inspector which edition they’ll hold you to. Get the answer in writing.

    Source: LARA BCC currently open rules · LARA license renewals (no code-update requirement)

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • Boiler licenses renew by December 31

    If you or a tech carry a Michigan boiler license, it renews every year by December 31. Renewal opens 90 days early, so you can do it now.

    Who this hits

    LARA’s Bureau of Construction Codes lists four boiler license types:
    – Boiler Installer: $100. Late fee $100 after 60 days. If expired more than 3 years, you re-apply and re-test.
    – Boiler Repairer: $100. Late fee $100 after 60 days. If expired more than 3 years, you re-apply and re-test.
    – Boiler Inspector: $100, or $80 for low/high pressure license holders. Late fee to match after 60 days.
    – Boiler Operator: $100 for stationary engineer, $80 for low/high pressure. Late fee to match after 60 days.

    None of these need a code-update course to renew.

    A typical small-shop scenario

    You do mostly furnaces and AC. One senior tech holds a boiler installer license for the hydronic jobs every winter. If that renewal slips past Dec 31, they’re working on an expired license right when boiler season peaks. Wait past the 60-day grace window and you also eat a $100 late fee. Let it go 3 years and they’re back at the exam.

    How to renew

    • Express Pay works without logging in.
    • Or log into Accela, LARA’s online system. Update your address first if it changed. You may need to link the license to your account before you can renew.

    What to do this month

    • List everyone in the shop with a boiler license and their expiration date.
    • Renew in November, before the holiday rush.
    • Put Dec 31 on next year’s calendar too. It’s annual.

    Also coming: Michigan is rewriting the Boiler Code rules. See the rulemaking roundup.

    Source: LARA BCC license renewals

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • EPA’s 15 lb HFC leak rule: what it means for a small Michigan shop

    Short version: there’s a federal leak repair rule for HFC systems, and it’s been live since January 1, 2026. Most of your residential changeouts aren’t covered. Your commercial refrigeration customers probably are.

    What the rule is

    It’s part of EPA’s Emissions Reduction and Reclamation rule, written under the AIM Act. The citation is 40 CFR Part 84, Subpart C, and the leak section is 84.106. It covers appliances with a full charge of 15 pounds or more of an HFC refrigerant, or of a substitute with a GWP above 53.

    Don’t mix it up with the older Section 608 rule. That one uses a 50 lb threshold and covers ozone-depleting refrigerants like R-22. It still exists. This is a second, separate rule aimed at HFCs.

    What’s NOT covered

    This matters most for a shop like ours. EPA’s fact sheet says appliances in the residential and light commercial air conditioning and heat pump subsector are not covered by these leak repair requirements. Your typical 3-ton split system in a Benton Harbor ranch house isn’t in scope. Neither are systems running refrigerants with a GWP of 53 or below.

    What IS covered

    Think walk-in coolers and freezers, reach-in rack systems, supermarket systems, process chillers, and larger commercial comfort-cooling equipment. Anything 15 lb or more on an HFC like R-404A, R-134a or R-410A, outside the residential/light-commercial AC subsector.

    How it works on a service call

    1. Every time you add refrigerant to a covered appliance, the owner has to calculate a leak rate. The rule names a few exceptions: right after a retrofit, a new install, or a seasonal variance.
    2. If the leak rate is over the threshold, the clock starts. The thresholds are 30% for industrial process refrigeration, 20% for commercial refrigeration, and 10% for everything else.
    3. The leak has to be found and repaired within 30 days, or 120 days if an industrial process shutdown is needed.
    4. Verification tests confirm the fix.

    Example: you top off a restaurant’s walk-in. It holds 22 lb of R-404A. You add 6 lb. Annualized, that’s well over 20%. The owner now has 30 days to get it fixed. Your job is to tell them, document it, and quote the repair.

    Paperwork

    Whoever adds or removes refrigerant has to give the owner documentation. That covers the appliance and its location, the date, the parts worked on, the type of service, the tech’s name, and the refrigerant type and amount. The owner keeps these records for at least three years. Full-charge records are kept until three years after the unit is retired. Owners also had to determine the full charge of every covered appliance by Jan 1, 2026, or at installation for newer units.

    Reports go to EPA in some cases: extension requests, retrofit or retirement plans, and chronic leakers (more than 125% of full charge lost in a calendar year).

    What to do this month

    • Sort your commercial customers into “15 lb+ HFC” and “not covered.”
    • Add charge size, refrigerant added and leak rate fields to your service ticket.
    • Explain the 30-day clock to the owners. Most have never heard of it.

    Still moving

    In May 2026 EPA proposed exempting road and shipping-container transport refrigeration units. That doesn’t touch typical HVAC work. We found no proposal to change the 15 lb threshold itself.

    Sources: EPA leak repair fact sheet · 40 CFR 84.106 · EPA reporting resources

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.