  • Michigan mechanical contractor license: classifications and requirements

    Michigan licenses mechanical work by classification. One mechanical contractor license can carry several. The list and the experience rules are in the Skilled Trades Regulation Act, not in a local city ordinance.

    Who needs a mechanical contractor license

    Under MCL 339.5809, you generally need a mechanical contractor’s license (with the right classification) and the appropriate permit before you install, alter or service work in the classifications below. LARA’s mechanical page says licensed mechanical contractors can perform installations, alterations and servicing, and secure permits.

    A municipality can’t invent its own mechanical licensing requirements for those classifications (MCL 339.5811).

    The work classifications

    MCL 339.5807(2) lists these classifications. LARA’s mechanical licensing page lists the same ones:

    1. Hydronic heating and cooling and process piping
    2. HVAC equipment
    3. Ductwork
    4. Refrigeration
    5. Limited heating service
    6. Limited refrigeration and air conditioning service
    7. Unlimited heating service
    8. Unlimited refrigeration and air conditioning service
    9. Fire suppression
    10. Specialty

    “Limited” and “unlimited” service, and what “specialty” covers (solar heating and cooling; solid fuel and vented decorative gas appliances; LP distribution piping; fuel gas piping; fuel gas piping and venting), are defined in MCL 339.5803 and in R 339.5161. If you already hold the HVAC equipment classification, R 339.5161(2) says you don’t also need those specialty licenses for that specialty work.

    Experience and exams

    • For a new classification, you generally need 3 years or 6,000 hours of experience in that classification, shown with employer statements signed under penalty of perjury (MCL 339.5807(1)(a)). LARA restates the same rule on its mechanical licensing page.
    • A completed 2-year (or equivalent) HVAC program from a recognized school, or a USDOL-approved 2-year HVAC training program, can count for up to 1 year / 2,000 hours of that experience (MCL 339.5807(5)).
    • Military experience can count with the right discharge papers and a commanding-officer affidavit (MCL 339.5807(3)–(4)).
    • Adding a classification to an existing license: LARA’s experience-requirements notice says you must have held the prerequisite classification for at least 3 years immediately before you apply (for example, ductwork requires HVAC equipment). The statute sets out the same prerequisite pairs as a route to eligibility (MCL 339.5807(1)(b)).
    • You must take and pass an exam for each classification you want. PSI runs the exams; approved applicants schedule with PSI and pay the exam fee to PSI (LARA mechanical page).

    Fees and renewal

    • LARA’s experience notice: initial mechanical contractor license/classification application fee $300 (non-refundable). Adding a classification mid-cycle: $300 / $200 / $100 depending on year of the license cycle.
    • Renewal: every three years by August 31. Not every contractor renews in the same year. Renewal fee $300; late fee $100 if you miss the deadline (LARA renewals). You can start renewing 90 days before expiration.
    • If the license has been expired more than 3 years, LARA says you re-apply and re-test.
    • LARA’s renewals page says you are not required to take code-update courses for a mechanical contractor license under the rules in force today.

    Coming up: pending Skilled Trades rules

    The Skilled Trades Regulation Rules rewrite (2025-58 LR) has final rule language and a JCAR report posted Sept 29, 2026. As of Oct 19, 2026, its Filing date and Effective date are Pending, and the final rules say they take effect 90 days after filing (state rule tracker, 2025-58 LR). The final language of R 339.5161 would add three things for mechanical contractors. These are not in effect yet:

    • Code-update course at renewal: “As a condition of renewal of a mechanical contractor license, a mechanical contractor shall demonstrate the successful completion of a course, approved by the department, concerning any update or change in the Stille-DeRossett-Hale single state construction code act, 1972 PA 230, MCL 125.1501 to 125.1531, within 12 months after the update or change in that code.” It applies only in or after years the code changes.
    • Boiler route to hydronic: holding at least a low-pressure boiler installer license for at least 1 year could stand in for experience for classification 1, hydronic heating and cooling and process piping.
    • Adding a classification: submit the department’s application with the non-refundable application fee.

    Michigan is also moving to the 2024 IMC (rule set 2025-7 LR, filing Pending). If both take effect, the code-update course rule would matter for that change. See our 2024 IMC post below.

    What to do

    • Confirm which classifications your company actually holds before you bid a fire-suppression, hydronic or unlimited-service job.
    • Apply and renew through Accela: aca-prod.accela.com/LARA.
    • Use LARA’s mechanical contractor application and keep the employer statements detailed (BTU ratings, refrigerants, equipment types, dates).

    Sources: MCL 339.5807 · MCL 339.5809 · MCL 339.5803 · LARA mechanical licensing · LARA renewals · R 339.5101–5412

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for HVAC/Mechanical contractors: Michigan HVAC/Mechanical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan Rehabilitation Code: draft moves existing buildings to the 2024 IEBC

    Michigan’s rehab code for existing buildings just moved a step forward. On Oct 19, 2026, the state posted draft rule language that would adopt the 2024 International Existing Building Code (IEBC) as the Michigan Rehabilitation Code for Existing Buildings. Filing and effective dates are still Pending.

    What’s in force today

    • The current Michigan Rehabilitation Code adopts the 2021 IEBC by reference, with Michigan amendments in R 408.30551 to R 408.30577.
    • LARA’s code books page lists the current Michigan Rehabilitation Code as effective April 9, 2025.
    • The code covers repair, alteration, change of occupancy, addition and relocation of existing buildings. New, never-occupied buildings go under the Michigan Building Code instead (current R 408.30554).

    Where the update stands

    • Rule set: 2025-40 LR, Rehabilitation Code (R 408.30551–R 408.30577).
    • State rule tracker: Request for Rulemaking approved Oct 6, 2025. Draft Rule Language Approved Oct 19, 2026.
    • As of Oct 19, 2026, Filing date and Effective date both say Pending. No notice of public hearing is posted yet on the tracker.
    • The draft says the rules become effective 120 days after filing with the Secretary of State (same formula the codes use).
    • LARA held a public rules advisory meeting on the proposed Rehabilitation Code draft on May 21, 2026 (LARA currently open rules). That meeting is past; the Oct 19 draft is the next tracker document.

    What the draft would change

    From the draft rule language and the request for rulemaking (verified Oct 19, 2026):

    • Model code: R 408.30551 would adopt the 2024 IEBC (first printing, August 2023) instead of the 2021 edition, with Michigan exceptions.
    • Rescissions: R 408.30552 (references to international codes), R 408.30553 (title), R 408.30558 (preliminary meeting / right of entry) and R 408.30577 (applicability add-ons) would be rescinded. Some of that content moves into R 408.30551 and R 408.30554.
    • Scope: The draft keeps the scope (repair, alteration, change of occupancy, addition, relocation) but strikes Michigan’s sentence sending never-occupied buildings to the Michigan Building Code for new construction (draft R 408.30554).
    • Accessibility: The draft rewrites the primary-function accessible-route language in R 408.30561 so the cost cap ties to MCL 125.1513g (costs of the accessible route need not exceed 20% of the alteration costs that affect the primary-function area).
    • Not the new code yet: Until LARA files and the 120-day clock runs, the 2021-based Michigan Rehabilitation Code still governs.

    Who it affects

    Builders and M&A contractors doing alterations, additions, change-of-occupancy work or other rehab on existing buildings under the Michigan Rehabilitation Code. Permit-exempt work listed in R 408.30560 (for example, a one-story accessory shed 120 sq ft or less, or painting and similar finish work) stays in the draft with the same structure; confirm the final text when it’s filed.

    What to do

    • Now: Keep designing and permitting under the current 2021-based rehab code.
    • Get on LARA’s list: email LARA-BCC-Rules@michigan.gov with the rule set you want in the subject line (LARA’s open-rules page explains the format).
    • Watch the tracker for a hearing notice, then for Filing and Effective dates. When it’s filed, you have about four months before it takes effect.
    • Separately, the 2021-based residential code update for one- and two-family homes is still held up by the July 7, 2025 court stay posted on LARA’s open-rules page. See our residential-code status post below.

    Sources: ARS tracker 2025-40 LR · current R 408.30551–30577 · LARA code books · LARA currently open rules · MCL 125.1513g

    Want a free sample issue? Sign up for the free sample. Pick your trades and we’ll email you the sample PDF.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 19, 2026. Confirm with LARA or your local building department before you act.

  • Michigan building permits, inspections and occupancy: the basics

    Michigan’s Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230) sets the ground rules for permits and inspections. The law calls the office that issues permits and inspects the work the “enforcing agency.”

    The permit

    • Before construction, the owner or the owner’s builder, architect, engineer or agent applies in writing to the enforcing agency, with the fee, plans drawn to scale and a site plan (MCL 125.1510(1)).
    • If you apply as the owner’s builder, you file a written contract or letter of authorization from the owner. A residential builder or M&A contractor must list their license number and its expiration date (MCL 125.1510(2)).
    • The agency must grant or deny the application within 10 business days, or 15 for an unusually complicated building. If it doesn’t act in time, that counts as a denial you can appeal (MCL 125.1511(1)).
    • Except as the act or code allows, don’t start work until the permit is issued, and build to the approved plans (MCL 125.1511(1)).

    Inspections

    • The enforcing agency inspects permitted work periodically (MCL 125.1512(1)).
    • Inspections happen between 8 a.m. and 6 p.m. on business days or while work is going on, except in an emergency or with permission (MCL 125.1512(2)).
    • If work doesn’t match the permit or the code, the agency sends written notice. If you don’t show good cause within 1 full working day, it posts a stop-construction order (MCL 125.1512(3)).

    Certificate of occupancy

    • A new building can’t be used or occupied until a certificate of use and occupancy is issued (MCL 125.1513).
    • For alterations, an existing use that didn’t stop during the work can continue for 30 days after completion without a new certificate (MCL 125.1513).
    • Once the work qualifies, the agency issues the certificate within 5 business days of a written application and fee. A temporary certificate is possible for parts that are safe to occupy (MCL 125.1513).
    • The agency gives at least 12 hours’ notice of the final inspection (MCL 125.1513).

    What to do

    • Carry your license number and expiration date to every permit application.
    • Don’t schedule move-in until the certificate of occupancy is issued.
    • Fees and local procedures vary, so check with your local building department.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Michigan energy code for houses: where it stands

    For houses, Michigan’s energy rules live in the residential code. A 2021 update is on hold, so the 2015-based rules still apply.

    Houses

    • LARA says residential energy requirements are contained in the Michigan Residential Code (LARA code books). The current residential code is the 2015 edition, effective Feb 8, 2016 (LARA).
    • Rule set 2021-48 LR (Part 10, Michigan Uniform Energy Code, R 408.31001 to R 408.31086) was filed May 1, 2025 with an effective date of Aug 29, 2025 on the state tracker (state tracker).
    • The July 7, 2025 Court of Claims stipulated order stops LARA from implementing the two rule sets that would update the residential code and its residential energy chapter to the 2021 IRC and 2021 IECC. While it stands, the 2015 residential IECC provisions “will remain valid and in effect” (LARA currently open rules).
    • As of Oct 17, 2026, LARA’s open rules page still shows that order in place.

    Commercial and multifamily work

    • The 2021 Michigan Commercial Energy Code took effect April 22, 2025 (LARA code books).
    • Proposed: an update, rule set 2025-41 LR (Part 10a), is in progress. LARA held an advisory meeting on the draft May 21, 2026, and the tracker shows draft rule language approved Oct 13, 2026 (LARA, state tracker). As of Oct 17, 2026, filing and effective dates are “Pending” (tracker).

    What to do

    • Keep building houses to the energy chapter of the 2015 Michigan Residential Code.
    • If a customer or supplier quotes 2021 IECC numbers for a house, they’re quoting rules that aren’t in effect in Michigan right now.
    • We’ll alert members if the court order changes.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Which Michigan Residential Code is in effect? Status of the 2021 update

    Short answer: the 2015 Michigan Residential Code. A 2021-based update was finished but is on hold by court order.

    What’s in effect now

    • The 2015 Michigan Residential Code took effect Feb 8, 2016, and LARA still lists it as the current code (LARA code books).
    • The Michigan Residential Code covers one- and two-family homes. LARA notes that residential requirements for building, mechanical, plumbing, energy and electrical work are in the Michigan Residential Code (LARA code books). The current rules are R 408.30500 to R 408.30547g (Michigan Administrative Code).

    The 2021 update and the court stay

    • Rule set 2022-16 LR would adopt, in part, the 2021 IRC. The state tracker shows it filed May 1, 2025 with an effective date of Aug 29, 2025 (state tracker).
    • On July 7, 2025, the Michigan Court of Claims issued a stipulated order in Home Builders Assoc. et al. v. LARA et al. It stops LARA from “taking additional steps necessary to apply or implement” this rule set and the matching residential energy rule set while the case continues (LARA currently open rules).
    • While the order stands, LARA says the 2015 versions “will remain valid and in effect” (LARA).
    • As of Oct 17, 2026, LARA’s open rules page still shows the stay. The court order itself is posted with the “Final Rule Language” on the tracker.

    Bigger buildings: the Michigan Building Code

    • The 2021 Michigan Building Code took effect April 9, 2025 (LARA code books). It covers buildings that aren’t under the residential code.
    • Proposed: rule set 2025-48 LR would adopt the 2024 IBC with Michigan amendments (request for rulemaking). LARA held a public advisory meeting on the draft on May 21, 2026 (LARA, draft rules). As of Oct 17, 2026, the state tracker shows the filing and effective dates as “Pending” (state tracker). It isn’t the rule yet.
    • The 2021 Michigan Rehabilitation Code took effect April 9, 2025 (LARA). An update, 2025-40 LR, is pending with no filing or effective date as of Oct 17, 2026 (state tracker).

    What to do

    • Build and bid houses to the 2015 Michigan Residential Code, not the 2021 IRC.
    • Remember: at renewal you state that you have a current copy of the Michigan Residential Code (MCL 339.2404(6)).
    • To get rule notices, email LARA-BCC-Rules@michigan.gov with the rule set name in the subject line (LARA).

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Builder and M&A license renewal and continuing competency in Michigan

    Michigan residential builder and M&A licenses renew every 3 years. Here’s what LARA requires, with the law behind it.

    Renewal basics

    • Licenses renew every 3 years by May 31. LARA says “not all residential builder licenses renew the same year,” and gives the same note for company, individual and salesperson licenses (LARA renewals page). Check the expiration date printed on your license or in Accela. A license lapses the day after that date (MCL 339.411(1)).
    • You can renew starting 90 days before your expiration date (LARA).
    • Renewal is $150. Renewing after expiration adds a $20 late fee, rising to $35 after 60 days (LARA).
    • Individual licensees can use Express Pay. Company and branch licenses must renew by logging in to Accela (LARA).
    • A company needs both its company license and its qualifying officer’s individual license renewed. If the individual license lapses, the company license is suspended under section 2405 (LARA, MCL 339.2405).
    • When you renew, you state that you have a current copy of the Michigan Residential Code and meet the continuing competency requirements (MCL 339.2404(6)).

    How many hours

    LARA’s summary: 21 hours in your first or second renewal cycle, 3 hours in your third cycle or later (LARA renewals page). The statute has more detail (MCL 339.2404b(2)):

    • First licensed on or after Jan 1, 2009: at least 21 hours per 3-year cycle, including at least 3 hours each calendar year during the first 6 years, and at least 3 hours on state building codes and laws, safety, and changes in construction and business law.
    • Licensed before Jan 1, 2009, or licensed more than two 3-year cycles (with no discipline): at least 3 hours per cycle, made up of 1 hour of codes, 1 hour of safety and 1 hour of legal issues.
    • If LARA has disciplined you, it can order 3 to 21 extra hours in the next cycle (MCL 339.2404b(3)).
    • Company licenses and salespersons don’t need continuing education for those licenses (LARA).

    What counts

    • Construction code update courses approved by the Bureau of Construction Codes, and fire or workplace safety courses approved or sponsored by LARA (MCL 339.2404b(4)).
    • Courses approved by another state’s builder board or by a national, regional or local home builder association, plus college courses, teaching, code hearings and other listed activities (Mich. Admin. Code R 338.1564(1)).
    • Credit is based on 50 minutes of continuous instruction per hour, with half credit for each extra 25 minutes. Breaks and meals don’t count (R 338.1564(4)).
    • Online courses can count (R 338.1566(3)).
    • LARA publishes the 2026/2029 approved course list.

    Proof and waivers

    • Keep your certificates for at least 5 years (MCL 339.2404(7)). You only send proof if you’re audited (LARA).
    • A waiver request must reach LARA before your license cycle expires (R 338.1565).

    What to do

    • Look up your expiration date in Accela and put it, and the date 90 days before it, on the calendar.
    • Count your hours now. If you’re in your first 6 years, make sure you have 3 hours in every calendar year.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Michigan residential builder and M&A licenses: the basics

    Michigan licenses two kinds of residential contractors under Article 24 of the Occupational Code: residential builders and residential maintenance and alteration (M&A) contractors. LARA’s Bureau of Construction Codes runs the licensing (LARA residential builders page).

    Who needs which license

    • Residential builder: someone who, for pay other than wages, builds, replaces, repairs, alters, adds to, improves or demolishes a residential structure (MCL 339.2401(a)).
    • M&A contractor: someone who, for pay, repairs, alters, adds to, improves or demolishes a residential structure, builds a garage, or lays concrete on residential property (MCL 339.2401(b)). An M&A license names the specific craft or trade, such as carpentry, concrete, roofing, siding and gutters, insulation, masonry, excavation or basement waterproofing (MCL 339.2404(3)).
    • “Residential structure” means a detached 1- or 2-family dwelling, or a townhouse of not more than 3 stories with a separate means of egress, plus related facilities (MCL 339.2401(c)).

    Main exemptions

    You don’t need this license if, among other exemptions listed in MCL 339.2403:

    • You’re the owner working on a structure on your property for your own use and occupancy.
    • You only work under contract to a licensed builder or M&A contractor.
    • The whole project is under $600 for labor, materials and everything else. Splitting a job into small contracts to dodge the license doesn’t count.
    • You’re a licensed electrical, plumbing or mechanical contractor doing only that trade’s work.

    Getting licensed

    • Prelicensure: 60 hours of approved courses, with at least 6 hours each in business management, design and building science, contracts and risk, marketing and sales, project management, the current Michigan Residential Code, and MIOSHA construction safety (MCL 339.2404b(1)(c)). LARA publishes the approved course list.
    • Exam: you must pass an exam on your obligations to the public and the licensing laws (MCL 339.2404(2)).
    • Place of business: you must keep a place of business in Michigan (MCL 339.2404(4)).
    • Companies: a company license needs a qualifying officer who also holds an individual license. If the qualifying officer leaves, the company license is suspended unless LARA allows time to name a new one (MCL 339.2405).
    • Licenses run 3 years (MCL 339.2404(5)).

    Why it matters

    • An unlicensed contractor can’t sue to collect payment for work that needed a license, and can’t put a lien on the property (MCL 339.2412(1) and (3)).
    • Prosecutors and the Attorney General can seek a civil fine of $5,000 to $25,000 against unlicensed contractors (MCL 339.2412(4)).
    • Homeowner complaints generally must be filed within 18 months of completion, occupancy, purchase, the certificate of occupancy, or closing, depending on the job (MCL 339.2411(1)).

    What to do

    • Check your own license and your subs’ licenses on LARA’s lookup before you sign.
    • If you run a company, make sure your qualifying officer’s individual license is current too.

    Next: renewals and continuing competency.

    More for Builders contractors: Michigan Builders updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 17, 2026. Confirm with LARA or your local building department before you act.

  • Skilled Trades rules rewrite: what electricians should know

    LARA is rewriting the Skilled Trades Regulation rules. That’s the rule set behind electrical licensing, along with plumbing, mechanical and others.

    What LARA says it does

    • Sets “clear and consistent fees and experience requirements” for registrations, licenses and exam applications.
    • Addresses continuing education requirements.
    • Clarifies complaint procedures.
    • Moves the boiler rules out into their own rule set.

    Timeline

    • Published in the Sept 1, 2026 Michigan Register.
    • Hearing Sept 10, 2026. Comments closed Sept 11.
    • Takes effect 90 days after filing. As of Oct 15, 2026, the state has not filed it or published an effective date. Final rule text went to the Legislature’s rules committee Sept 29, 2026 (state rule tracker, 2025-58 LR).

    Why it matters for an electrical shop

    Apprentice-to-journeyman and journeyman-to-master paperwork, exam fees, and possibly CE rules could change. Combined with the 2026 NEC adoption, 2027 could bring both new CE rules and a new code. The final text is on the state rule tracker. Until it’s filed and in effect, today’s fees and CE rules apply.

    What to do

    • Re-check LARA before any 2027 exam application.
    • Subscribe to LARA notices by emailing LARA-BCC-Rules@michigan.gov.

    Source: LARA BCC currently open rules

    More for Electrical contractors: Michigan Electrical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • Residential wiring and the Michigan Residential Code stay

    Here’s a wrinkle that confuses a lot of electricians. The Michigan Electrical Code (Part 8, now the 2023 NEC) isn’t the whole story on houses.

    What LARA says

    LARA’s code book page, under the 2023 NEC listing: “Residential requirements are contained in the Michigan Residential Code.”

    The residential code is frozen

    • Michigan tried to move the residential code to parts of the 2021 IRC and 2021 IECC, effective Aug 29, 2025.
    • A July 7, 2025 Court of Claims order (Home Builders Assoc. et al. v. LARA et al.) stopped LARA from implementing it while the case is pending.
    • The 2015 IRC and IECC residential provisions Michigan adopted remain in effect.
    • As of Oct 15, 2026, LARA’s open rules page still says the 2015 versions “will remain valid and in effect” while the order stands.

    Which NEC applies to houses?

    The current Michigan Residential Code is built on the 2015 IRC, with its electrical chapters 34 to 43, and lists NFPA 70-2014 (the 2014 NEC) as its referenced electrical standard (Mich. Admin. Code R 408.30501 and E3401). It also allows wiring methods from the Michigan Electrical Code. Ask your inspector before you lean on any 2023 or 2026 NEC rule on a house.

    Example

    A homeowner asks for an outdoor receptacle and a new heat pump circuit. The 2026 NEC outdoor GFCI rules aren’t automatically your requirement on that house. Confirm with the local inspector which rules they’ll inspect to.

    Sources: LARA code books · LARA open rules (court order details)

    More for Electrical contractors: Michigan Electrical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.

  • Electrical code-update courses: when you need one

    Short answer from LARA: masters, journeymen, fire alarm specialty techs and sign specialists are “only required to take a code update course within one year of new code being adopted. This does not happen every year.”

    Who needs it

    • Master electrician: yes, within one year of new code adoption.
    • Journeyman: yes.
    • Fire alarm specialty technician: yes.
    • Sign specialist: yes.
    • Apprentices: no code-update course to renew.
    • Electrical / fire alarm / sign contractor license: not required for the contractor license itself.

    You don’t submit proof unless you’re audited. Keep a copy of your certificate.

    How many hours?

    LARA’s renewal page doesn’t list hours. Michigan’s current rule on code update courses doesn’t set hours either (Mich. Admin. Code R 339.5119). The old 15-hour (master, journeyman) and 8-hour (sign) rule was rescinded. Buy a course that’s approved for your license in CE Broker.

    Why this matters now

    Michigan is drafting the 2026 NEC adoption. Once it’s adopted, the one-year clock starts. Plan for a 2027–28 course for every licensed person in your shop.

    The law says “within 12 months after the update or change” in the state code (MCL 339.5713(4)). Neither the law nor LARA’s renewal page says whether that runs from filing or from the effective date. Ask LARA in writing.

    Tips

    • Look for courses that cover the 2026 NEC changes plus Michigan Part 8 rules, once providers update them.
    • Don’t take a 2023 NEC course to satisfy a 2026 adoption.

    Sources: LARA BCC license renewals · LARA open rules

    More for Electrical contractors: Michigan Electrical updates.

    Michigan Code Brief · Not legal advice. Every fact links to its official source. Checked Oct 15, 2026. Confirm with LARA or your local building department before you act.